关于在水泥工业中应用Delphi和模糊Delphi技术的叙述性回顾
Samane Khorshidikia1, Masoud Rismanchian2, Ehsanollah Habibi2
1Student Research Committee and Department of Occupational Health Engineering, School of Health, Isfahan University of Medical Sciences, Isfahan, Iran.
Work (Reading, Mass.)
|May 8, 2025
概括
德尔菲技术帮助水泥行业专家就环境影响和绩效指标达成共识. 这种方法对于行业的稳定和可持续发展至关重要.
科学领域:
- 工业工程 工业工程 工业工程
- 环境科学 环境科学
- 材料科学 材料科学 材料科学
背景情况:
- 德尔菲技术及其模糊变体是建立跨行业专家共识的既定方法.
- 关于它们在水泥制造行业的具体应用的研究有限.
- 本次审查通过专注于水泥行业来弥合这一差距.
研究的目的:
- 在水泥工业中探索和引入Delphi技术和模糊Delphi技术的应用.
- 突出它们在评估环境影响和优先考虑绩效指标方面的作用.
- 为行业稳定和增长提供见解.
主要方法:
- 对2015年至2024年间发表的研究进行叙述性审查.
- 专注于在水泥工业中使用德尔菲技术的研究.
- 确定主要的应用领域.
主要成果:
- 德尔菲技术主要用于评估水泥生产对环境的影响.
- 它还用于识别和排名可持续发展和发展的关键绩效指标.
- 通过这些方法有效地实现了专家的共识.
结论:
- 德尔菲技术和模糊的德尔菲技术是水泥行业专家共识的重要工具.
- 这些方法改善了行业可持续性和增长的决策.
- 建议进行进一步的研究,以探索它们在应对行业挑战方面的潜力.
更多相关视频
相关概念视频
Decision Making: P-value Method
The process of hypothesis testing based on the P-value method includes calculating the P- value using the sample data and interpreting it.
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim is also stated. These statements can act as null and alternative hypotheses: a null hypothesis would be a neutral statement while the alternative hypothesis can have a...
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim is also stated. These statements can act as null and alternative hypotheses: a null hypothesis would be a neutral statement while the alternative hypothesis can have a...
Portland Cement
Portland cement is the essential binding ingredient in concrete, made from finely ground materials including lime, iron, silica, and alumina. Lime is derived primarily from limestone, marble, marl, seashells, and clays, which also supply iron and alumina, while silica is sourced from sand, chalk, and bauxite. Contemporary manufacturing of Portland cement is a significant source of carbon dioxide emissions, prompting research into reducing its content in concrete through alternative...
Fineness of Cement
The fineness of cement directly influences the rate of hydration, as the hydration begins at the surface of the cement particles. In addition to hydration, the fineness of cement is vital for various properties of concrete including workability, gypsum requirement, and long-term behavior. The fineness of cement is represented in terms of the specific surface of cement which is typically measured in square meters per kilogram, with several methods available for this determination.
Direct...
Direct...
Soundness of Cement
The soundness of cement refers to the ability of cement paste to retain its volume after setting. Unsound cement can lead to expansion and structural damage due to the presence of free lime, magnesia, and calcium sulfate. Free lime hydrates very slowly, expanding and causing unsoundness, which is difficult to detect because it intercrystallizes with other compounds. Magnesia also reacts with water, forming crystals that can disrupt the cement's structure. Calcium sulfate can create ettringite,...
Types of Cement II
Portland blast-furnace cement is made by blending Portland cement clinker with granulated blast-furnace slag, which accounts for 25 to 65 percent of the cement's weight. Despite its similarities to ordinary Portland (Type I) cement in terms of fineness and setting times, its early strength is lower, though it achieves comparable strength later on. It's particularly suited for mass concrete structures and marine environments due to its lower heat of hydration and superior sulfate resistance.
Design Example: Managing Concrete Workability
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
To address...


