泥裂合的数值分析 在混凝土材料中多个裂的接地修复过程中
Xiaochen Wang1, Wei Li2, Mingxiang Shen1
1School of Civil Engineering, Shandong Jianzhu University, Jinan 250101, China.
Materials (Basel, Switzerland)
|June 13, 2025
概括
这项研究揭示了泥在修复过程中如何与混凝土裂相互作用. 裂开口的变化取决于裂模式和接压力,更多的裂加剧了泥与混凝土的相互作用.
科学领域:
- 土木工程 土木工程是指土木工程.
- 材料科学 材料科学 材料科学
- 计算力学 计算力学 计算力学
背景情况:
- 破裂混凝土的接修复对于结构完整性至关重要.
- 泥和混凝土裂之间的相互作用使多裂材料的扩散复杂化.
研究的目的:
- 为了研究多裂混凝土中的泥混凝土裂相互作用机制.
- 分析不同接压力下的裂开口变化.
- 了解裂分布和数量对接扩散的影响.
主要方法:
- 使用蒙特卡洛方法生成随机裂模式.
- 为破裂混凝土开发一个孔隙裂介质模型.
- 在模型中推导出泥连续性方程.
- 应用修改的接口层理论来分析泥混凝土合效应.
主要成果:
- 裂开口变化主要受到裂分布和趋势的影响.
- 在恒定的接压力下观察到四种明显的裂开口变化模式.
- 增加的接压力会影响范围,但对于类似的裂纹模式,裂纹开放规则不会发生变化.
- 较多的裂增加了泥混凝土合效应.
结论:
- 这项研究为破裂混凝土中泥扩散的复杂物理提供了洞察力.
- 了解这些相互作用对于优化接维修策略至关重要.
- 这些发现有助于开发更有效的混凝土维修工程技术.
相关概念视频
Microcracking in Concrete
111
Microcracking in concrete refers to the tiny cracks that can form within the material even before any external load is applied. These microcracks typically occur at the interface between the coarse aggregate and the hydrated cement paste, often as a result of differential volume changes prompted by variations in stress-strain behavior, as well as thermal and moisture movement. Initially, these microcracks remain stable and do not grow substantially until the concrete is stressed to about 30...
111
Types of Non-structural Cracks in Concrete
133
Non-structural cracks are primarily of three types: plastic, early-age thermal, and drying shrinkage cracks. Plastic cracks are further classified into plastic shrinkage cracks and plastic settlement cracks.
Plastic shrinkage cracks typically form within hours after the concrete is poured. The concrete's surface dries faster than the bottom, creating tensile stress that the still-plastic concrete cannot withstand, leading to diagonal or randomly patterned cracks on the concrete surface.
Plastic shrinkage cracks typically form within hours after the concrete is poured. The concrete's surface dries faster than the bottom, creating tensile stress that the still-plastic concrete cannot withstand, leading to diagonal or randomly patterned cracks on the concrete surface.
133
Creep in Concrete
194
Creep refers to the time-dependent increase in strain under a sustained load, excluding other time-dependent deformations associated with shrinkage, swelling, and thermal expansion in concrete. The primary mechanism behind creep involves the loss of physically adsorbed water from the calcium silicate hydrate within the hydrated cement paste. This process is further exacerbated by concrete's non-linear stress-strain relationship, microcrack development in the interfacial transition zone, and...
194
Tensile Strength Considerations of Concrete
118
Considering the tensile strength of concrete involves recognizing that the theoretical strength of cement paste can be up to a thousand times higher than what is observed in practical applications. This significant discrepancy is largely attributed to the presence of microscopic cracks within the concrete. These cracks tend to amplify stress at their tips when a load is applied, a phenomenon explained by Griffith's theory of brittle fracture.
The dimensions and shape of a concrete specimen...
The dimensions and shape of a concrete specimen...
118
Shrinkage in Concrete
88
Shrinkage in concrete is primarily due to water loss from evaporation, hydration of cement, or carbonation, leading to a reduction in volume. The volumetric contraction results in volumetric strain in concrete. However, in practice, shrinkage is measured as linear strain, which is one-third of the volumetric strain.
When concrete is still in its plastic state, it can undergo a decrease in volume by about 1% of its absolute volume. This decrease is known as plastic shrinkage. It arises either...
When concrete is still in its plastic state, it can undergo a decrease in volume by about 1% of its absolute volume. This decrease is known as plastic shrinkage. It arises either...
88
Slump Test
189
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
189


