相关实验视频
Updated: Jun 16, 2025

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.0K
优化河流恢复:一个多场景的方法来消除障碍物优先考虑
Mayra E Darre1, Sami Domisch2, Virgilio Hermoso3
1Department of Chemistry and Bioscience, Aalborg University, Denmark.
Journal of environmental management
|June 14, 2025
概括
根据欧盟自然恢复法,优先考虑清除河流障碍对生态系统恢复至关重要. 空间优化确定了重点区域,以恢复连接和沿海区域,平衡生态目标与社会经济因素.
科学领域:
- 河流生态学 河流生态学
- 保护科学 保护科学
- 空间规划 空间规划 空间规划
背景情况:
- 河流障碍分裂生态系统,破坏连接,沉积物运输,水流和生物多样性.
- 欧盟的自然恢复法 (NRL) 要求通过清除障碍物恢复河流连接.
- 有效实施NRL需要数据驱动的优先级策略来消除障碍.
研究的目的:
- 开发和应用一个多场景空间优化框架,以优先考虑拆除河流障碍物.
- 确定最大限度地提高生态效益 (生物多样性,侵蚀减少) 的地区,同时最大限度地减少社会经济影响.
- 通过平衡生态和社会经济方面的考虑,支持有效的河流恢复规划.
主要方法:
- 使用多场景空间优化框架与多标准决策分析相结合.
- 评估了七个保护场景,重点关注生物多样性,侵蚀和减轻人类影响.
- 将框架应用于多河流域内的莫拉瓦子流域.
主要成果:
- 由于成本不同,消除障碍的优先级在不同场景中差异很大.
- 确定了一致的优先级区域,对于改善连通性和沿海恢复至关重要.
- 通过消除在确定优先区域的障碍,有可能恢复1011公里自由流动的河流和604公的河岸区域.
结论:
- 基于场景的空间优化提供了一个结构化的方法,以平衡生态恢复与社会经济约束.
- 解决小型障碍的数据缺口,并将分析扩展到更大的规模,对于未来的改进至关重要.
- 跨境合作对于实现大规模河流恢复目标至关重要,例如NRL的25,000公里目标.
更多相关视频
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
41
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
41
Design Example: Alignment of a Road Line Using GIS
47
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
47
Typical Model Studies
350
Fluid mechanics model studies often utilize scaled-down systems to predict fluid behavior in full-scale environments, such as river flows, dam spillways, and structures interacting with open surfaces. Maintaining Froude number similarity in river models is crucial, as it replicates surface flow features like wave patterns and velocities.
350
Rapidly Varying Flow
56
Rapidly varying flow (RVF) in open channels is characterized by abrupt changes in flow depth over a short distance, with the rate of depth change relative to distance often approaching unity. These flows are inherently complex due to their transient and multi-dimensional nature, making exact analysis difficult. However, approximate solutions using simplified models provide valuable insights into their behavior.Key Features of Rapidly Varying FlowRVF is commonly observed in scenarios involving...
56
Design Example: Creating a Hydraulic Model of a Dam Spillway
148
Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
148
Conservation of Mass in Moving, Nondeforming Control Volume
1.1K
Stormwater detention basins are essential in managing runoff during heavy rainfall, particularly in urban areas where impervious surfaces increase the risk of flooding. Understanding the conservation of mass in these systems allows engineers to optimize basin performance, balancing inflow, outflow, and water storage.
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
1.1K

