概括
岩石的特性在挖掘过程中显著影响了细和碎片. 更高的岩石强度和密度减少了罚款,而质地影响了裂传播,优化了挖掘性能.
科学领域:
- 地质技术工程 地质技术工程
- 机械化挖掘科学 机械化挖掘科学
背景情况:
- 岩石切割会产生罚款和碎片,影响挖掘效率.
- 了解岩石特性是优化切割性能的关键.
研究的目的:
- 为了研究各种岩石特性对机械切割过程中的细粒和芯片生产的影响.
- 为了将岩石特性与切割行为和挖掘结果相关联.
主要方法:
- 在13个不同的岩石样本上使用形工具进行了小规模的线性切割测试.
- 通过分析和分析机械,物理和微观性质来量化罚款的生产.
主要成果:
- 单轴压力强度 (UCS) 与罚款相反相关;较高的UCS产生较少的罚款.
- 岩石密度增加和孔隙性减少减少了罚款,增加了芯片生产.
- 纹理系数是最有影响力的微观性质,促进裂的传播,并最大限度地减少罚款.
结论:
- 岩石特性,特别是UCS和质地,在切割过程中严格控制细和芯片生成.
- 了解这些关系可以优化挖掘策略和提高设备性能.
相关概念视频
Design Example: Aggregate Gradation
151
The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
151
Shape and Texture of Coarse Aggregate
288
Aggregate shape is classified based on the relative sharpness or roundness of the edges and corners. This classification includes categories like rounded, angular, elongated, and flaky, each with specific characteristics. Rounded aggregates, fully shaped by attrition, are typical of river or seashore gravel, while angular aggregates, such as crushed rock, have well-defined edges. Aggregates that are elongated and flaky are less desirable, as they can reduce the workability and strength of...
288
Design Example: Managing Concrete Workability
123
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
123
Bonding and Strength of Aggregate
265
The bond between aggregate particles and the cement matrix is significantly influenced by the shape and surface texture of the aggregates. High-strength concretes benefit from a rougher texture, which leads to stronger bonding due to greater adhesion. Angular aggregates with larger surface areas also enhance this bond. The bonding quality, however, is complex to assess as no universally accepted test exists. Good bonding is indicated when a crushed concrete specimen shows some aggregate...
265
Specific Gravity of Aggregate
395
Aggregates typically contain pores, which can be either permeable or impermeable. Considering the pores in the aggregates, the specific gravity of aggregates is defined in three different forms, namely, bulk or gross specific gravity, apparent specific gravity, and absolute specific gravity.
Bulk or gross specific gravity is calculated by taking the ratio of the mass of aggregates in the saturated surface-dry state to the total volume that includes both the solids and the voids within the...
Bulk or gross specific gravity is calculated by taking the ratio of the mass of aggregates in the saturated surface-dry state to the total volume that includes both the solids and the voids within the...
395
Compacting Factor test
257
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
257