在goaf的现场条纹间隔粘贴填充后的屋顶控制效果
Kang Yang1, Jianbo Cao2, Qiang Zhang3
1School of mines, China University of Mining and Technology, Xuzhou, Jiangsu, China.
Scientific reports
|July 2, 2025
概括
这项研究引入了一种新的粘贴填充后采矿方法,用于在敏感区域下更安全地开采煤炭. 该研究开发了一种机械模型和回归方程,以优化回填参数,确保在最小的材料使用下有效地控制屋顶.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 固体力学 固体力学是什么
背景情况:
- 煤炭开采面临着地下基础设施和材料短缺的挑战.
- 有效的屋顶控制对于安全和资源回收至关重要.
研究的目的:
- 提出和验证一种"浸入和打击现场条间粘贴回填采矿"技术.
- 建立一个机械模型,用于在粘合剂填充矿业协作式屋顶控制.
- 开发回归方程以优化填充参数并确保屋顶的稳定性.
主要方法:
- 开发一个用于屋顶控制的机械模型.
- 分析影响屋顶倾斜和曲时刻的因素.
- 多变量非线性回归分析.
- 用于验证的FLAC3D数值模拟.
主要成果:
- 均分布的超负荷负荷显著影响了屋顶的倾斜和曲时刻.
- 开发出了非常精确的回归方程 (R2 > 0.996 入,R2 > 0.999 罢工).
- 在填充机身宽度和关键回填间隔之间存在功率函数关系.
- 确定了齐班镇矿井的优化参数,显示最低回填率为~36%.
结论:
- 拟议的"浸泡和打击现场条间粘贴回填采矿"方法对屋顶控制有效.
- 开发的机械模型和回归方程准确地预测了屋顶的行为.
- 该研究提供了条间粘贴回填采矿的实用设计方案,平衡提取与材料效率.
更多相关视频
08:09Measuring and Mapping Patterns of Soil Erosion and Deposition Related to Soil Carbonate Concentrations Under Agricultural Management
Published on: September 12, 2017
11.9K
06:21Installation Method to Enhance Quality Control for Fiber Reinforced Polymer Spike Anchors
Published on: April 10, 2018
7.2K
相关概念视频
Porosity in Cement Paste
233
The porosity of concrete is a measure of the void spaces within its structure. These spaces impact its strength and durability significantly. When water and cement interact, a chemical reaction called hydration creates a semi-solid paste. This paste includes combined water, making up approximately 23% of the cement's dry mass, and gel water, which fills minuscule voids known as gel pores, accounting for about 28% of the cement gel volume.
The balance of water to cement in the mix is...
The balance of water to cement in the mix is...
233
Preplaced Aggregate Concrete
142
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
142
Cavity Drainage and Flashings in Masonry walls
148
Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
148
Posttensioned Masonry Walls
210
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
210
Mortar Joint Deterioration in Masonry
166
Mortar joint deterioration is a significant concern in masonry structures, with water accumulation in the joints leading to damage from freeze-thaw cycles. The repeated expansion of water during freezing and its melting during thawing develop and propagate cracks in the masonry joints. Eventually, this leads to the spalling of mortar from the joints, loosening masonry units and weakening the structure. The deteriorated mortar joints are also vulnerable to moisture intrusion into the walls.
The...
The...
166
Taping Over Different Ground Profiles
99
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
99
