基于直觉模糊集的地下开口中岩石破裂风险的预测
Xin Wang1, Kebin Shi2, Quan Shi3
1College of Civil Engineering, Nanyang Institute of Technology, Nanyang, China.
Scientific reports
|July 2, 2025
概括
这项研究引入了一个新的岩石爆发风险预测模型,使用直观的模糊集合理论. 该模型准确地评估了地下工程中的岩石破裂潜力,在高压力条件下提高了安全性.
科学领域:
- 地质工程是地质工程.
- 风险评估 风险评估
- 模糊的集合理论 模糊的集合理论
背景情况:
- 岩石破裂是地下建筑中的一个重要的地质危险.
- 高地压力环境加剧了岩石爆裂的风险.
- 有效的风险预测对于减轻灾害损失至关重要.
研究的目的:
- 提出一个新的岩石爆破风险预测模型.
- 将影响岩石爆裂的内部和外部因素纳入其中.
- 为了提高岩石爆发预测的准确性和可靠性.
主要方法:
- 利用直观的模糊集合论来进行风险预测.
- 采用了球形模糊分析层次过程和灰色关系分析的合算法,用于索引权重.
- 纳入会员和非会员级别来处理预测的不确定性.
主要成果:
- 拟议的模型在预测岩石爆裂方面表现出高准确度和可靠性.
- 对35个岩石爆破案例的验证和与云模型理论的比较证实了模型的有效性.
- 在中国新疆的坎坦4号 (KT4) 道的成功应用.
结论:
- 开发的模型为岩石爆破风险评估提供了一种可靠的方法.
- 它为地下工程安全研究提供了新的视角.
- 该模型的准确性支持其在高压环境中的实际应用.
相关概念视频
Prediction Intervals
2.3K
The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
2.3K
The Availability Heuristic
6.4K
A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
6.4K
Uncertainty: Confidence Intervals
4.8K
The confidence interval is the range of values around the mean that contains the true mean. It is expressed as a probability percentage. The interpretation of a 95% confidence interval, for instance, is that the statistician is 95% confident that the true mean falls within the interval. The upper and lower limits of this range are known as confidence limits. The confidence limits for the true mean are estimated from the sample's mean, the standard deviation, and the statistical factor...
4.8K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
106
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
106
Uncertainty: Overview
995
In analytical chemistry, we often perform repetitive measurements to detect and minimize inaccuracies caused by both determinate and indeterminate errors. Despite the cares we take, the presence of random errors means that repeated measurements almost never have exactly the same magnitude. The collective difference between these measurements - observed values - and the estimated or expected value is called uncertainty. Uncertainty is conventionally written after the estimated or expected value.
995
Fault Types
130
When analyzing a single line-to-ground fault from phase A to ground at a three-phase bus, it is important to consider the fault impedance. This impedance is zero for a bolted fault, equal to the arc impedance for an arcing fault, and represents the total fault impedance for a transmission-line insulator flashover. To derive sequence and phase currents, fault conditions are translated from the phase domain to the sequence domain.
For line-to-line faults occurring between phases B and C, the...
For line-to-line faults occurring between phases B and C, the...
130


