在软煤层中完全机械化的顶层煤挖掘导致了显著的过载变形和表面沉降. 这项研究揭示了由于高采矿高度和软层而加速失效和增加的导水断裂.
科学领域:
- 地质技术工程 地质技术工程
- 采矿工程 采矿工程 采矿工程
- 环境地质 环境地质学
背景情况:
- 在"三软"厚厚的煤层中,完全机械化的顶层煤挖掘 (FMTC) 在超负荷变形和表面沉降方面提出了独特的挑战.
- 了解这些机制对于减轻水层破坏和强烈的表面反应至关重要.
研究的目的:
- 研究"三软"厚煤层的FMTC采矿中的超负荷变形和表面沉降机制.
- 分析高采矿高度和软层对超负荷稳定性和导水断裂区域的影响.
- 为减轻沉降危险提供理论见解.
主要方法:
- 物理相似性建模以模拟超负荷变形和沉降.
- 使用现场监测数据验证实验结果.
- 分析过载层的紧缩,膨胀系数和断裂模式.
主要成果:
- 超负荷压缩显示了分层层的异质性,较低层的扩张更大 (积压系数为1.039).
- 断裂模式从"简单支梁"演变为"杆梁"结构.
- 观察到导水断裂区域高度与接比率 (12.33) 和最大沉降因子 (0.956) 的增加.
结论:
- 高采矿高度和软层破坏过载的稳定性,加速上层层破裂并增加导水断裂区域.
- 表面沉降是由高峰体积膨胀驱动的,导致因素超过厚采矿的经验值.
- 该研究提供了对超负荷-表面相互作用的关键见解,以在具有挑战性的采矿条件下有效地进行沉降管理.
相关概念视频
Slump Test
442
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
442
Compacting Factor test
257
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
257
Quarrying of Stone
203
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
203