基于BeiDou系统的高速公路斜坡变形监测精度提升方法的研究
1Dr., School of Civil Engineering, Chongqing Jiaotong University, Chongqing, China.
PloS one
|July 14, 2025
概括
本研究介绍了一种基于BeiDou卫星的多路径误差缓解技术. 该方法通过实时校正和数据融合,将复杂地形的斜率监测精度提高了50%以上.
科学领域:
- 地质测量是指地质测量.
- 卫星导航 卫星导航 卫星导航 卫星导航
- 地质技术工程 地质技术工程
背景情况:
- 道卫星系统中的多路径效应降低了斜率监测的准确性.
- 精确的变形监测对于防止地质技术危险至关重要.
研究的目的:
- 开发和验证一个多路径误差缓解技术,用于北斗卫星式斜率监测.
- 在具有挑战性的环境中提高定位和变形监测的准确性.
主要方法:
- 多路径效应的分析和建模.
- 使用校正信号实现实时错误校正机制.
- 整合卡尔曼过和多源数据融合以提高准确性.
主要成果:
- 在具有校正信号的复杂地形中,定位精度提高了53.53%66.40%.
- 在应用校正后,变形监测的准确性增加了50.62%60.10%.
- 多源数据融合实现了高达71.16%的定位精度和66.84%的变形监测精度提升.
结论:
- 拟议的实时错误校正技术显著提高了道系统对斜率监测的准确性.
- 该方法在山脉和峡谷等复杂的地形上是有效的.
- 数据融合进一步优化了性能,为变形监测精度提供了实质性的优势.
相关概念视频
Distance Corrections
83
To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
83
Design Example: Maintaining Level of an Embankment
128
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
128
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device
171
Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
171
Common Leveling Mistakes and Errors
128
A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
128
Beams with Unsymmetric Loadings
168
Analyzing a supported beam under unsymmetrical loadings is essential in structural engineering to understand how beams respond to varied force distributions. This analysis involves calculating the deflection and identifying points where the slope of the beam is zero, which are crucial for ensuring structural stability and functionality.
The first moment-area theorem determines the slope at any point on the beam. This theorem indicates that the change in slope between two points on a beam...
The first moment-area theorem determines the slope at any point on the beam. This theorem indicates that the change in slope between two points on a beam...
168
Field Procedure for Staking Out Curves
152
Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
152