使用灰色马尔科夫模型对宏观建筑安全指标的时间序列预测
Zhipeng Zhou1, Song Liu1, Sainan Lyu2
1Department of Management Science and Engineering, College of Economics and Management, Nanjing University of Aeronautics and Astronautics, China.
概括
灰色的Verhulst-Markov模型 (GVMM) 有效地预测了中国的建筑安全趋势. 这种先进的模型准确地预测了事故率和死亡人数,为行业安全管理提供了强大的工具.
科学领域:
- 建筑安全管理 建筑安全管理
- 预测建模预测建模
- 灰色系统理论 灰色系统理论
背景情况:
- 中国建筑业面临着动态的安全挑战.
- 准确预测安全指标,如事故率和死亡人数至关重要.
研究的目的:
- 确定最适合用于预测中国建筑业动态安全情况的灰色马尔科夫模型.
- 评估五种不同的灰色马尔科夫模型对关键安全指标的预测准确度.
主要方法:
- 五个灰色马尔科夫模型的比较分析:灰色维赫尔斯特-马尔科夫模型 (GVMM),偶灰色马尔科夫模型 (EGMM),离散灰色马尔科夫模型 (DGMM),原始差异灰色马尔科夫模型 (ODGMM) 和偶差异灰色马尔科夫模型 (EDGMM).
- 使用宏观建筑安全指标对预测性表现的评估:每1000万元人民币的事故率和每1000万元人民币的死亡人数.
主要成果:
- 与其他四种模型相比,灰色的Verhulst-Markov模型 (GVMM) 在两个安全指标方面都显示出明显优异的预测准确性.
- GVMM被证明是分析和预测安全趋势的强大和有效工具.
结论:
- 建议GVMM作为预测中国建筑行业在宏观层面上的动态安全条件和未来趋势的最佳方法.
- 这一发现为加强该行业的安全管理策略提供了有价值的见解.
相关概念视频
Survey Safety
148
Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
148
Prediction Intervals
2.3K
The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
2.3K
Steps in Outbreak Investigation
204
In the ever-evolving field of public health, statistical analysis serves as a cornerstone for understanding and managing disease outbreaks. By leveraging various statistical tools, health professionals can predict potential outbreaks, analyze ongoing situations, and devise effective responses to mitigate impact. For that to happen, there are a few possible stages of the analysis:
204
Hazard Rate
188
The hazard rate, also known as the hazard function or failure rate, is a statistical measure used to describe the instantaneous rate at which an event occurs, given that the event has not yet happened. From a probabilistic perspective, it represents the likelihood that a subject will experience the event in a very small time interval, conditional on surviving up to the beginning of that interval. In terms of frequency, the hazard rate can be viewed as the ratio of the number of events to the...
188
Survival Tree
159
Survival trees are a non-parametric method used in survival analysis to model the relationship between a set of covariates and the time until an event of interest occurs, often referred to as the "time-to-event" or "survival time." This method is particularly useful when dealing with censored data, where the event has not occurred for some individuals by the end of the study period, or when the exact time of the event is unknown.
Building a Survival Tree
Constructing a...
Building a Survival Tree
Constructing a...
159
End Point Prediction: Gran Plot
586
A Gran plot is used to predict the equivalence volume or endpoint of a potentiometric or acid-base titration without reaching the endpoint. Typically, titration data is collected as a function of the titrant's volume up to a point less than the equivalence volume and then transformed into a linear format. The straight line is extended to the x-axis, indicating the necessary titrant volume to achieve the equivalence point.
For potentiometric titration, the Gran plot is created by plotting...
For potentiometric titration, the Gran plot is created by plotting...
586


