相关实验视频
Updated: Sep 11, 2025

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.1K
基于多维价值合的当代文化景观的评估:大运河杭州段的案例研究
Wenli Dong1, Wenying Han1, Yue Xu2
1Department of Regional and Urban Planning, Zhejiang University, Hangzhou, Zhejiang, China.
PloS one
|August 18, 2025
概括
本研究引入了一种新的多维价值体系,用于评估大运河文化景观项目. 它分析了杭州10个项目的保护和利用情况,为可持续发展的遗产开发提供了一个模型.
科学领域:
- 文化景观研究 文化景观研究
- 遗产管理 遗产管理
- 城市规划 城市规划
背景情况:
- 大运河的世界遗产地位需要对文化景观项目进行科学评估.
- 协调遗产保护,土地利用和城市发展对于大运河国家文化公园至关重要.
- 现有的价值范式需要适应当代文化景观.
研究的目的:
- 为大运河文化景观构建一个多维价值评估系统.
- 探索保护和发展价值观之间的协同调整机制.
- 评估和分析杭州文化景观项目的保护利用合协调.
主要方法:
- 开发了一个基于文化景观价值范式演变的多维价值评估系统.
- 应用合协调度理论来分析协同调整机制.
- 对杭州10个当代文化景观项目进行了价值评估和合协调分析.
主要成果:
- 为大运河文化景观建立了一个全面的多维价值评估系统.
- 对10个杭州项目的保护和利用之间的合协调程度进行了分析.
- 获得了对保守价值和发展价值的协同调整机制的见解.
结论:
- 该研究为协调大运河沿线的保护,土地利用和城市发展提供了科学基础.
- 讨论了杭州大运河文化景观的实际保护和利用模式.
- 这项研究为未来在大运河沿线的文化景观建设提供了宝贵的参考资料,强调了"城市与河流的相互依赖".
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
101
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
101
Design Example: Sustainability in Concrete Building
226
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
226
Design Example: Design of an Irrigation Channel
217
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
217
Design Example: Marking Boundaries of a Site Using a Compass
88
Marking site boundaries using a compass is a precise surveying technique that ensures the accuracy of boundary delineation. The process begins by using provided site details, including the bearings and lengths of each boundary line. The initial step involves calculating latitudes and departures for all sides of the site. This computation verifies that the traverse is free of errors, ensuring a closed and accurate boundary.The process starts at a known point, such as Point A, which is often...
88
Design Example: Alignment of a Road Line Using GIS
104
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
104
Design Example: Maintaining Level of an Embankment
122
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
122

