实地实验研究关于在广土壤上的高填充堤的地面处理
Bin Hou1, Faning Dang2, Weihua Ding2
1Xi'an University of Technology, Xi'an, 710048, Shaanxi, China. 13359214651@163.com.
Scientific reports
|August 20, 2025
概括
动态压缩替代有效地提高了高填充堤的膨胀土壤承载能力. 这种土壤改善技术提高了稳定性,减少了定居点,为具有挑战性的地质条件提供了解决方案.
科学领域:
- 地质技术工程 地质技术工程
- 土壤力学 土壤力学
- 土木工程 土木工程是指土木工程.
背景情况:
- 谷区的高填充堤经常面临基础承载能力不足的挑战.
- 安康机场搬迁现场的膨胀土壤对堤构成重大稳定性风险.
研究的目的:
- 评估土壤改善技术对高填充堤下的广土壤的有效性.
- 为了比较动态压缩和石堆压缩,以提高基础性能.
主要方法:
- 在改善地面之前和之后进行了现场测试,包括板载荷和标准透测试 (SPT).
- 评估了两种技术:动态压缩和使用驱动外进行石堆压缩.
- 使用数值建模来验证定居点的变形.
主要成果:
- 自然基础土壤的承载能力为260kPa.
- 动态压缩更换将承载能力提高到580kPa,证明是最有效的.
- 动态压缩替换诱导了最小的沉积变形,由数值建模证实.
结论:
- 动态压缩替换是高填充堤项目中广土壤的高效土壤改善技术.
- 在应用动态压缩时,考虑复杂的平分层和浅岩基层至关重要.
- 该研究为在类似具有挑战性的环境中进行基础治疗提供了实际指导.
相关概念视频
Design Example: Maintaining Level of an Embankment
122
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
122
Taping Over Different Ground Profiles
88
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
88
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
101
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
101
Design Example: Managing Concrete Workability
121
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
121
Slump Test
421
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
421
Flow Table Test
262
The flow table test is an established method used to assess the workability of concrete, particularly useful for evaluating highly flowable concrete mixes. This test employs an apparatus that consists of a wooden board topped with a steel plate, collectively weighing 35 pounds. The board is connected to a base via a hinge and measures 27.6 inches on each side.
Concrete is placed within a truncated cone mold that is 8 inches high with an 8-inch base diameter and a 5-inch top diameter. The...
Concrete is placed within a truncated cone mold that is 8 inches high with an 8-inch base diameter and a 5-inch top diameter. The...
262