对制造砂混凝土的收缩预测模型的分析和纠正
Wei Fan1, Yang Wei1,2, Jiyang Yi1
1College of Civil Engineering, Nanjing Forestry University, Nanjing 210037, China.
Materials (Basel, Switzerland)
|August 28, 2025
概括
制造砂混凝土 (MSC) 的收缩不同于天然砂混凝土. 结合工业砂的新模型提高了绿色建筑的收缩预测准确度.
科学领域:
- 土木工程
- 材料科学
- 可持续建设
背景情况:
- 天然沙子的枯竭需要制造沙子等替代材料.
- 与传统混凝土相比,制造的砂混凝土具有不同的收缩行为.
- 现有的收缩模型不充分考虑制造砂的特性,限制了准确性.
研究的目的:
- 评估MSC的经典收缩预测模型.
- 确定现有模型在制造砂的特性方面的局限性.
- 为准确的MSC收缩预测开发增强型号.
主要方法:
- 使用实验MSC数据对ACI 209,CEB-FIP 2010,B3和GL 2000模型进行系统评估.
- 影响收缩的制造砂的特性 (颗粒形态,分级,石粉) 的分析.
- 开发一种基于非线性回归的校正函数,其中包含制造砂的含量.
主要成果:
- 由于忽视了制造砂的特性,B3和CEB-FIP 2010模型显示了显著的预测差异.
- 开发的校正功能,使用制造砂含量,增强了ACI 209和GL 2000模型.
- 经过修改的模型显示MSC在所有替换率上都提高了适配性能和预测稳定性.
结论:
- 经典的收缩模型需要重新校准才能准确地预测MSC.
- 制造砂含量是改善收缩模型的关键变量.
- 改进的模型为预测MSC缩提供了可靠的框架,支持可持续建筑.
更多相关视频
相关概念视频
Shrinkage in Concrete
169
Shrinkage in concrete is primarily due to water loss from evaporation, hydration of cement, or carbonation, leading to a reduction in volume. The volumetric contraction results in volumetric strain in concrete. However, in practice, shrinkage is measured as linear strain, which is one-third of the volumetric strain.
When concrete is still in its plastic state, it can undergo a decrease in volume by about 1% of its absolute volume. This decrease is known as plastic shrinkage. It arises either...
When concrete is still in its plastic state, it can undergo a decrease in volume by about 1% of its absolute volume. This decrease is known as plastic shrinkage. It arises either...
169
Design Example: Aggregate Gradation
147
The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
147
Drying Shrinkage
153
When hardened concrete is exposed to air with a relative humidity of less than 100 percent, it begins to lose the free water within its capillaries. As this water evaporates, the water initially adsorbed onto the calcium silicate hydrates migrates towards these now empty spaces and eventually evaporates as well. Over time, as more water leaves, the volume of the concrete decreases, a phenomenon known as drying shrinkage.
A portion of this drying shrinkage can be reversed; if the concrete is...
A portion of this drying shrinkage can be reversed; if the concrete is...
153
Design Example: Managing Concrete Workability
121
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
121
Deleterious Substances in Aggregate
248
Deleterious substances in aggregates can be detrimental to the quality and durability of concrete. These substances include organic impurities like loam, which interfere with cement hydration and are usually present in the sand. These prevent a good bond between aggregate and cement paste. Organic impurities can be detected using the colorimetric test, where the darkness of a solution after agitation indicates the level of organic content.
Another type of impurity is clay and fine material that...
Another type of impurity is clay and fine material that...
248
Slump Test
418
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
418