概括
这项研究引入了基于无人机的温度检查方法,以优化电力传输线路的预防性维护. 它为有效的飞行规划和资源分配提供了优先级工具.
科学领域:
- 工程
- 电气工程
- 维护工程
背景情况:
- 基于无人机的温度测定已经提升了电气设备的预防性维护.
- 电力特许经营商需要有效的检查输电线路.
研究的目的:
- 提出一种方法来优先考虑无人机在温度检查中的飞行性能.
- 提高电力特许权人的预防性维护计划的效率.
主要方法:
- 在预防性维护计划中实施温度计技术.
- 使用分析层次过程 (AHP) 多标准方法来确定优先级.
- 确定技术,安全,系统,社会和财务标准和替代方案.
主要成果:
- 建立了一种对传输线路温度检查的优先级方法.
- 定义的标准和选择被赋予重量和重要性.
- 开发了一个工具来帮助确定检查的优先级.
结论:
- 开发的工具有助于运输承包商优化温度检查优先级.
- 通过优先级飞行性能来确保设备的有效使用.
- 该方法支持有效的电力基础设施预防性维护策略.
相关概念视频
Distribution Reliability and Automation
153
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
153
Pilot and Numeric Relaying
135
Pilot relaying is a type of differential protection used in power systems. It compares electrical quantities at the terminals of equipment via a communication channel instead of direct relay interconnection. This method is essential for transmission lines where the terminals are far apart, typically up to 80 km for lines with 69 to 115 kV ratings. Four types of communication channels are used for pilot relaying:
135
Transmission Line Design Considerations
213
Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
213
Maximum Power Flow and Line Loadability
178
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
178