概括
这项研究表明,绿色排水系统有效地延迟了平均15分钟的雨水峰值. 虽然峰值流量减少是有限的,但这种绿色基础设施为雨水管理策略提供了有希望的解决方案.
科学领域:
- 环境工程
- 水文学
- 绿色基础设施
背景情况:
- 对于城市地区来说,雨水管理至关重要.
- 需要创新的绿色基础设施解决方案来缓解排水影响.
- 绿色墙壁可能会阻和延迟雨水.
研究的目的:
- 评估一种新型绿色排水系统的效率,
- 评估绿色沟的最大流量减少和延迟能力.
主要方法:
- 一个实验试点研究使用4米的垂直矿物质羊毛填充柱 (绿色沟).
- 安装湿度传感器和流量计来监测系统的性能.
- 用不同的流量和持续时间进行测试,模拟不同的降雨事件.
主要成果:
- 绿色排水持续延迟了15分钟的雨水流量.
- 观察到极限的峰值流量减少,只有在特定的短时间,较低回报期的降雨事件中减少了30-50%.
- 该系统展示了在峰值流量中产生时间滞后的巨大潜力.
结论:
- 绿色排水是一个有前途的绿色基础设施解决方案.
- 它的主要好处在于延迟峰值流量,帮助下游流域的峰值流量管理.
- 进一步的研究可能会优化其设计以提高峰值流量减少.
相关概念视频
Design Example: Sustainability in Concrete Building
225
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
225
Design Example: Maintaining Level of an Embankment
122
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
122
Design Example: Alignment of a Road Line Using GIS
104
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
104
Adaptations that Reduce Water Loss
26.3K
Though evaporation from plant leaves drives transpiration, it also results in loss of water. Because water is critical for photosynthetic reactions and other cellular processes, evolutionary pressures on plants in different environments have driven the acquisition of adaptations that reduce water loss.
26.3K
Design Example: Design of an Irrigation Channel
216
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
216
Cavity Drainage and Flashings in Masonry walls
141
Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
141