考虑恢复和维修协作优化的故障分配网络的恢复策略
Naiwei Tu1, Yibo Shi1, Yuqiang Hao1
1Faculty of Electrical and Control Engineering, Liaoning Technical University, Huludao, China.
PloS one
|September 3, 2025
概括
这项研究引入了多次故障后发电网络恢复的新策略. 它优化了网络重新配置和修复序列,以实现更快,更有效的故障恢复.
科学领域:
- 电气工程
- 电力系统工程
背景情况:
- 分配网络面临故障恢复和紧急维修的挑战.
- 负载需求和分布式发电 (DG) 产量的不确定性使恢复复杂化.
研究的目的:
- 提出一个协作优化策略,用于分配网络的故障恢复和紧急维修.
- 考虑负载和GD变化的动态故障恢复的复杂性.
主要方法:
- 开发了考虑时间尺度阶段类型的双层动态故障恢复模型.
- 使用深度随机配置网络进行GD输出预测.
- 使用增强的坚果破碎器优化算法来优化重新配置和修复序列.
主要成果:
- 拟议的战略有效地优化了网络重新配置方案.
- 考虑到经济损失,确定最佳故障修复序列.
- 在IEEE33节点系统上的模拟验证了该战略的可行性和有效性.
结论:
- 这一策略确保了故障节点在电源故障后的有效恢复.
- 展示了协作优化在配送网络弹性方面的好处.
相关概念视频
Reclosers and Fuses
162
Automatic circuit reclosers enhance the protection of distribution circuits by interrupting and auto-reclosing an AC circuit according to a preset sequence. They effectively manage temporary faults on overhead distribution lines, often caused by tree limbs or wildlife, by briefly disrupting service to improve overall reliability. However, contact with reclosers or energized broken conductors on the ground can pose serious hazards.
A comprehensive protection scheme for radial distribution...
A comprehensive protection scheme for radial distribution...
162
Distribution Reliability and Automation
153
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
153
Distributed Loads: Problem Solving
729
Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
729
Fast Decoupled and DC Powerflow
282
The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
282
Zones of Protection
336
In power systems, the entire setup is divided into protective zones to isolate faults and protect the rest of the network. These zones include generators, transformers, buses, transmission lines, distribution lines, and motors. Each zone can be visualized as a separate room in a house, with each room protected by its own circuit breaker.
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
336
Radial System Protection
147
Radial systems employ time-delay overcurrent relays to reduce load interruptions. When a fault occurs, the nearest breaker opens first, while upstream breakers remain closed due to longer delay settings. This approach ensures minimal disruption to the rest of the system.
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...