参见盐:建议让养殖者参与社区沿海监测计划
Natalie G Nelson1,2, Marcelo Ardón3,4, Tal Ben-Horin5
1Biological and Agricultural Engineering, North Carolina State University, Raleigh, NC, USA. nnelson4@ncsu.edu.
Environmental monitoring and assessment
|September 11, 2025
概括
社区支持的水生监测计划,如See Salt,克服了传统沿海水域监测的局限性. 与专业人士 (如养殖者) 合作,可以进行常规的传感器维护,并扩大地理范围.
科学领域:
- 环境科学 环境科学
- 海洋生物学 海洋生物学
- 水资源管理 水资源管理
背景情况:
- 传统的河口和沿海水域监测面临着由于硬件维护需求,生物污染和恶劣环境条件的挑战.
- 需要大量前往远程监测站点的需要耗费资源,并限制沿海观测计划的范围.
研究的目的:
- 探索与水产行业专业人士的合作伙伴关系,以克服沿海监测的局限性.
- 介绍See Salt计划,这是社区支持监测与养殖者的案例研究,作为类似举措的典范.
主要方法:
- 与种植者合作,将持续的盐度和水位数据收集纳入他们的日常运营.
- 开发了一个社区支持的监测计划,专注于非学术专业人员的常规传感器维护.
主要成果:
- 通过与种植者合作,See Salt计划成功收集了连续的盐度和水位数据.
- 确定了建立和维护社区支持的水生物监测计划的关键建议.
结论:
- 与非学术专业人士的伙伴关系,如种植者,提供了一个可行的解决方案,以扩大水生监测的范围和降低水生监测的成本.
- 建议包括多方法评估,投资于低维护硬件,以及为可持续的社区监测提供全面的参与者培训.
更多相关视频
07:43Methods for Image-based Surveys of Benthic Macroinvertebrates and Their Habitat Exemplified by the Drop Camera Survey for the Atlantic Sea Scallop
Published on: July 2, 2018
10.1K
07:20Design and Use of an Apparatus for Quantifying Bivalve Suspension Feeding at Sea
Published on: September 5, 2018
8.3K
相关概念视频
Community Based Intervention
281
Community-based interventions in mental health represent a paradigm shift from institution-centered care to treatments embedded within the fabric of local communities. By prioritizing inclusion and leveraging existing societal structures, this approach fosters a supportive environment conducive to addressing mental health challenges while promoting individual dignity and agency.
Foundations of Community Mental Health Programs
Central to the success of community-based interventions is the...
Foundations of Community Mental Health Programs
Central to the success of community-based interventions is the...
281
Testing Water Quality
370
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
370
