混合设计和早期性能快速设置基CBPCs用于紧急道路维修
1Department of Fire Administration and Disaster Management, The College of Humanities & Social Sciences, Dong-Eui University, Busan 47340, Republic of Korea.
Materials (Basel, Switzerland)
|September 13, 2025
概括
化学结合酸盐陶 (CBPC) 复合材料为紧急坑洞修复提供了快速设置的解决方案. 这些先进的材料表现出很好的早期机械性能,符合严格的维修规格.
科学领域:
- 材料科学 材料科学 材料科学
- 土木工程 土木工程是指土木工程.
- 化学工程是化学工程的重要组成部分.
背景情况:
- 坑洞修复需要具有快速定位和高初始强度的材料.
- 传统的维修方法往往会受到耐用性和交通干扰问题的影响.
- 基于酸盐的陶是有希望的替代品,因为它们具有独特的结合性能.
研究的目的:
- 调查用于紧急坑洞修复的基于酸盐,化学结合酸盐陶 (CBPC) 复合材料的快速设置.
- 优化CBPC混合设计,适用于混凝土和青路面应用.
- 评估CBPC在基础设施维护中的早期机械和物理性能.
主要方法:
- 采用了两阶段的实验方法,从基本的混合设计开始.
- 第一个阶段系统地改变了水与粘合剂的比率,填充剂含量和酸盐粉末细度.
- 第二阶段评估了现场适用的混合物,评估了压力,曲和粘合强度随着时间的推移的发展.
主要成果:
- 优化的CBPC混合物在30分钟内达到压力强度>24MPa,在1小时内达到曲强度>3.4MPa.
- 在4小时内,粘合强度达到了1.62 MPa (混凝土) 和0.68 MPa (青).
- 材料表现出优异的马歇尔稳定性,100%的浸水残留稳定性,最小的长度变化和快速自填充能力.
结论:
- 开发的CBPC复合材料符合或超过紧急维修材料的国内规格.
- 拟议的混合设计适用于各种路面类型的坑修复的现场应用.
- 该研究强调了CBPC对基础设施维修中早期表现的实际影响和局限性.
更多相关视频
相关概念视频
Accelerators
275
Accelerators in concrete serve as admixtures to speed up the hardening process, enabling the concrete to achieve early strength faster. Although accelerators do not necessarily impact the time it takes concrete to set, they reduce this time in practice. A common accelerator is calcium chloride, which is particularly useful for hastening early strength development in cold weather or for rapid repair jobs that require quick heat generation after mixing.
The effectiveness of calcium chloride can...
The effectiveness of calcium chloride can...
275
Types of Cement I
354
Portland cement comes in several types, each with distinct properties and applications based on their chemical composition and hydration characteristics:
Type I (Ordinary Portland Cement) is widely used for general construction where special properties are not required. It has moderate sulfate resistance and heat of hydration.
Type II (Modified Cement) offers moderate resistance to sulfate attack and a lower rate of heat development compared to Type I. It is suitable for structures in...
Type I (Ordinary Portland Cement) is widely used for general construction where special properties are not required. It has moderate sulfate resistance and heat of hydration.
Type II (Modified Cement) offers moderate resistance to sulfate attack and a lower rate of heat development compared to Type I. It is suitable for structures in...
354
Accelerated Curing of Concrete
448
Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
448
Testing Water Quality
369
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
369
Retarders
257
Retarders are chemical admixtures designed to extend the setting time, which is especially useful when there is a delay in sequential concrete pours to prevent cold joints and to achieve a cohesive structure. Retarders, when used in appropriate amounts, can also enhance the architectural appearance of exposed aggregate finishes.
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
257
Design Example: Managing Concrete Workability
301
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
301


