维布里奥病毒 spp. : 作为哺乳动物的潜在关键病原体,其影响超出了海洋水产养殖的范围

Chengzhang Li1, Yiting Ji1, Xinying Li1

  • 1Guangdong Provincial Key Laboratory of Marine Disaster Prediction and Prevention, Guangdong Provincial Key Laboratory of Marine Biotechnology, Marine Biology Institute, Shantou University, Shantou, 515063, China.

BMC microbiology
|October 2, 2025
PubMed
概括

这项研究揭示了Vibrio细菌主导头鱼肠道和皮肤伤口微生物群,表明潜在的动物性疾病风险和需要对海洋哺乳动物健康进行监测.

相关概念视频

Microorganisms in Agriculture and Food industry01:27

Microorganisms in Agriculture and Food industry

Microorganisms play a crucial role in agriculture and the food industry, contributing to soil fertility, crop protection, and food production. Their functions range from nitrogen fixation and biopesticide production to fermentation and food preservation, making them indispensable to sustainable farming and food safety.Role in AgricultureNitrogen-fixing bacteria, such as Rhizobium (symbiotic) and Azotobacter (free-living), convert atmospheric nitrogen into ammonia through biological nitrogen...
1.4K
Bacterial Phylum Verrucomicrobiota01:26

Bacterial Phylum Verrucomicrobiota

The phylum Verrucomicrobiota comprises at least four characterized orders, with most species classified within the order Verrucomicrobiotales. Members of this phylum are either aerobic or facultatively aerobic, with the ability to ferment sugars. A notable exception is the genus Methylacidiphilum, which consists of aerobic methanotrophs. Additionally, some Verrucomicrobiota establish symbiotic relationships with protists. These bacteria are widely distributed across various environments,...
523
Microorganisms in Medicine and Therapeutics01:29

Microorganisms in Medicine and Therapeutics

Microorganisms play a fundamental role in vaccine development, gene therapy, and therapeutic production. Their biological properties are harnessed to advance medicine and public health. Beyond immunization, microorganisms contribute to gut health, antibiotic synthesis, and genetic disease treatment.Live Attenuated and Inactivated VaccinesLive attenuated vaccines, such as the measles, mumps, and rubella (MMR) vaccine, utilize weakened forms of pathogens to closely resemble natural infections.
982
Bacterial Translocation and Protein Secretion01:26

Bacterial Translocation and Protein Secretion

Bacterial protein secretion involves translocation systems to ensure proteins reach their designated locations, including the plasma membrane, periplasm, outer membrane, or the external environment. These translocation systems are vital for bacterial physiology, supporting processes like membrane assembly, enzymatic activity in the periplasm, and interactions with the external environment. The division of labor between Sec and Tat pathways ensures efficiency in handling proteins with diverse...
531
Biofilms01:29

Biofilms

Biofilms are complex communities of microorganisms encased in a self-produced extracellular polysaccharide matrix attached to surfaces. These microbial consortia can include single or multiple species, providing enhanced survival benefits by forming organized, multilayered structures.The formation of biofilms occurs through four key stages: attachment, colonization, development, and dispersal.During attachment, free-swimming planktonic cells adhere to a surface, often facilitated by...
1.2K
Healthcare Associated Infections I: Iatrogenic, Exogenic and Endogenic01:26

Healthcare Associated Infections I: Iatrogenic, Exogenic and Endogenic

Healthcare-associated infections (HAIs) occur in a healthcare facility while a person receives care for another ailment. This category also includes work-related infections among healthcare staff.
HAIs significantly increase the cost of health care. Extended stays in healthcare institutions, increased disability, increased costs of medications, including specialized antibiotics, and prolonged recovery times add to the patient's expenses and the healthcare institution and funding bodies.
5.4K