通过生命周期审计加强电网项目的治理和可持续性
Mo Zhou1, Yinhao Chen1, Liuzhao Zhou2
1State Grid Jiangsu Electric Power Co., Ltd., Nanjing, 21000, China.
Scientific reports
|October 17, 2025
概括
生命周期审计 (LAud) 提高了电网项目管理和风险控制. 这项研究开发了一个全面的LAud框架,改善复杂基础设施项目的治理和可持续性.
科学领域:
- 工程管理工程管理工程管理
- 审计 审计 审计 审计 审计
- 基础设施发展 基础设施发展
背景情况:
- 电网项目面临重大风险和复杂性.
- 传统的审计方法在管理这些风险方面存在局限性.
- 在电网开发中需要加强项目管理和风险控制.
研究的目的:
- 检查生命周期审计 (LAud) 在电网项目中的应用.
- 开发和测试电网生命周期的全面LAud框架.
- 加强电力部门的项目治理,风险控制和可持续性.
主要方法:
- 定性案例研究方法.
- 在内部审计框架内对全过程LAud模型的实施分析.
- 从29个已完成的电网项目和专家采访中分析数据.
主要成果:
- 制定一个全面的LAud框架,涵盖项目生命周期的所有阶段.
- 创建一个新的工作流程和一个数字平台来实现LAud.
- 通过实时监测和积极的风险减轻,证明了项目治理和可持续性的提升.
结论:
- 生命周期审计显著改善了电网开发中的项目治理和可持续性.
- 开发的LAud框架为项目监督和持续审计提供了可操作的见解.
- 劳德通过促进透明度,效率和弹性来支持电力部门的可持续发展.
相关概念视频
Electrical Power
3.7K
Electric power is the product of current and voltage, represented in units of joules per second, or watts. For example, cars often have one or more auxiliary power outlets with which you can charge a cell phone or other electronic devices. These outlets may be rated at 20 amps and 12 volts, so that the circuit can deliver a maximum power of 240 watts. Consider a 25 Watt bulb and a 60 Watt bulb. The conversion of electrical energy produces heat and light, while the kinetic energy lost by the...
3.7K
The Power Flow Problem and Solution
835
Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk, phase angle δk, real power Pk, and reactive power Qk. Two of these four variables are inputs, while the power flow program computes...
835
Power System Distribution
1.0K
Power system distribution involves delivering electrical energy from power plants to consumers through a network of transmission and distribution systems. The process begins at power plants, where energy from coal, gas, nuclear, water, and wind is converted into electrical energy. These plants use three-phase generators, typically rated between 50 to 1300 MVA, with terminal voltages ranging from a few kV to 20 kV, depending on the size and age of the units.
The transmission system is designed...
The transmission system is designed...
1.0K
Distribution Reliability and Automation
495
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
495
Conservation of AC Power
651
The principle of power preservation is applicable to both ac and dc circuits. This principle, when applied to AC power, asserts that the complex, real, and reactive powers produced by the source are equal to the total complex, real, and reactive powers absorbed by the loads. When two load impedances are connected in parallel to an ac source V, the complex power provided by the source can be calculated using the relation
651
Power System Three-Phase Short Circuits
519
Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
519