无菌复合:加强PEC和C-PEC的合规性
1Labconco Kansas City, Missouri. DWasescha@labconco.com.
International journal of pharmaceutical compounding
|October 20, 2025
概括
药剂师必须确保初级工程控制 (PECs) 和封闭初级工程控制 (C-PECs) 符合USP一般章节 (第797章) 关于无菌化合物的安全性和监管合规性的最新标准.
科学领域:
- 制药科学 制药科学
- 监管合规性 监管合规性
- 医疗保健安全 医疗保健安全
背景情况:
- 复合无菌产品 (CSP) 的无菌组合需要严格遵守安全协议.
- USP一般章节<797>提供了无菌复合实践的基本标准.
- 由于不断变化的考虑因素,定期审查和更新遵守USP <797>是至关重要的.
研究的目的:
- 强调遵守USP一般章节的最新更新的重要性<797>.
- 突出确保初级工程控制 (PEC) 和控制初级工程控制 (C-PEC) 符合当前标准的必要性.
- 通过将实践与监管预期和最佳实践保持一致,为即将到来的检查做好准备.
主要方法:
- 综述USP一般章节 <797> 最新更新.
- 对PEC和C-PEC现行标准的评估.
- 关于满足监管期望和最佳实践的指导.
主要成果:
- 最新更新的USP一般章节<797>现在已经完全生效.
- 确保PEC和C-PEC符合这些更新的标准对于合规至关重要.
- 建议积极为检查做好准备.
结论:
- 药剂师和技术人员必须优先遵守最新的USP797指南.
- PEC和C-PEC的正确运行和维护对于安全的无菌化合物是必不可少的.
- 保持与监管标准的最新状态确保了患者的安全和成功的检查.
相关概念视频
PPE Use in Healthcare Settings I: Donning
1.6K
Donning PPE must be completed before contact with the patient. This process protects from infectious agents. The sequence and action included in each donning are critical, and the steps must be systematic to avoid exposure to pathogens. The institutional policy also needs to be followed while donning PPE. The pre-donning preparations are gathering equipment, inspecting the PPE equipment for tears, holes, or damage, removing jewelry, removing any garments below the elbows, and tying the hair...
1.6K
Standard Precaution
2.7K
Standard precautions are the minimum infection control safeguards used while caring for all patients, irrespective of their disease condition. They help prevent the spread of common infectious microorganisms to healthcare workers, patients, and visitors in all healthcare settings.
Hand hygiene is the most crucial means to prevent the transmission of disease. Employers are legally required to provide their workers with personal protective equipment (PPE) to minimize exposure or contact with...
Hand hygiene is the most crucial means to prevent the transmission of disease. Employers are legally required to provide their workers with personal protective equipment (PPE) to minimize exposure or contact with...
2.7K
PPE Use in Healthcare Settings II: Doffing
1.5K
The sequence of removing or doffing PPE starts with the gloves, as they are the most contaminated. Next is removal of the face shield or goggles, as they would interfere with removing other PPE. Then remove the gown, followed by the mask or respirator. Perform hand hygiene between steps if hands become contaminated and immediately after removing all PPE. Generally, the outside front and sleeves of the isolation gown, the goggles or the mask, the respirator, and the face shield are contaminated.
1.5K
Clinically Relevant Drug Product Specifications: Methods of Establishment
201
Product specifications define the acceptable quality of a pharmaceutical product by ensuring identity, purity, potency, and strength. These specifications serve as benchmarks during development, manufacturing, and post-approval quality control. Clinically relevant specifications are particularly important because they directly relate to a drug's safety and efficacy in clinical use.Dissolution studies are critical biopharmaceutic tools that link in vitro behavior to in vivo performance. They...
201
Curing Methods
280
Concrete members with a small surface-to-volume ratio are cured by oiling and moistening the forms before casting the concrete member. These forms can be left in place for a prolonged period to prevent moisture loss, and can be wetted if made of a material suitable for wetting. If the forms are removed early, the concrete member is moistened and covered with polythene sheets to maintain moisture. For large horizontal concrete surfaces exposed to dry weather, a temporary covering is suspended...
280


