通过工业土地改造加强城市景观连接:整合利用效率和息地隔离评估

Heng Kan1, Guanqiao Ding2, Tao Zhou3

  • 1School of Geography and Ocean Science, Nanjing University, Nanjing, 210023, China; College of Land Management, Nanjing Agricultural University, Nanjing, 210095, China; Key Laboratory of Coastal Zone Exploitation and Protection, Ministry of Natural Resources, Nanjing, 210023, China.

概括

将未充分利用的城市工业用地 (UIL) 转化为生态脚石,大大提高了城市生态系统的连接性. 这种方法对于土地稀缺城市的可持续发展至关重要.

相关概念视频

Habitat Fragmentation02:31

Habitat Fragmentation

Habitat fragmentation describes the division of a more extensive, continuous habitat into smaller, discontinuous areas. Human activities such as land conversion, as well as slower geological processes leading to changes in the physical environment, are the two leading causes of habitat fragmentation. The fragmentation process typically follows the same steps: perforation, dissection, fragmentation, shrinkage, and attrition.
20.9K
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
386
Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
283
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
281
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
327
Hybrid Zones02:29

Hybrid Zones

Hybrid zones are narrow regions where two closely related species interact, mate, and produce hybrids. Relative to either parent species, hybrids may possess distinct phenotypic or genetic differences that impact their survival and reproductive success. The genetic variances introduced by hybridization influence species diversity and speciation processes within the hybrid zone.
21.7K