相关实验视频
Updated: Jan 11, 2026

08:43
Fused Filament Fabrication FFF of Metal-Ceramic Components
Published on: January 11, 2019
17.9K
弧接工艺作为切合陶的实用解决方案:进展和未来前景
J G Lopes1, J Shen1, J P Oliveira1
1CENIMAT/I3N, Department of Materials Science, NOVA School of Science and Technology, Universidade NOVA de Lisboa, 2829-516 Caparica, Portugal.
Materials (Basel, Switzerland)
|November 13, 2025
概括
陶材料的弧由于热挑战而发展不足. 气弧和等离子弧显示出可靠的陶连接的前景,需要进一步的研究.
科学领域:
- 材料科学 材料科学 材料科学
- 制造业 工程 制造工程
- 接技术 接技术
背景情况:
- 陶的弧是一种欠发达的领域.
- 挑战包括管理热梯度和应力度,导致裂和不可靠的关节.
- 陶的脆性和高点对接构成重大障碍.
研究的目的:
- 为了突出陶材料弧的欠发达性质.
- 为了确定阻碍可靠的陶连接通过弧的主要挑战.
- 探索气弧接和等离子弧接在陶应用中的潜力.
主要方法:
- 审查陶弧接当前的研究缺口.
- 分析与接易碎,高点材料相关的挑战.
- 确定有希望的陶弧接技术 (GTAW,PAW).
主要成果:
- 陶的弧面临着与热管理和材料特性相关的重大困难.
- 气弧 (GTAW) 和等离子弧 (PAW) 提供了潜在的解决方案.
- 目前缺乏对陶弧的理解和可靠的程序.
结论:
- 对陶弧接工艺的进一步研究是必不可少的.
- 开发优化的接程序对于可靠的陶元件制造至关重要.
- 陶弧接的进步可能会对工程应用产生重大影响.
更多相关视频
07:58Automatic Laser-based Geometry Capture for Finite Element Analysis of Weld Beads
Published on: July 25, 2025
742
08:29Multi-material Ceramic-Based Components – Additive Manufacturing of Black-and-white Zirconia Components by Thermoplastic 3D-Printing (CerAM - T3DP)
Published on: January 7, 2019
11.8K
相关概念视频
Steel Fastening Techniques
1.2K
Steel sections can be joined together through various fastening techniques including riveting, bolting, and welding, each suitable for different structural requirements and conditions.
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
1.2K
Manufacture of Concrete Masonry Units
362
The process of manufacturing concrete masonry units begins by mixing stiff concrete composed of Portland cement, aggregates, and water. This mixture is then poured into metal molds. To ensure the concrete settles uniformly and to avoid separation of its components, the mixture in the molds is subjected to vibration. Shortly after, the still-wet blocks are removed from the molds and placed on racks.
These wet blocks are then transported for curing, which can occur in one of two environments: a...
These wet blocks are then transported for curing, which can occur in one of two environments: a...
362
Residual Stresses
572
Residual stresses reside in a structure even after removing the original stress inducer. This phenomenon often arises from varied plastic deformations across different parts of a structure. Consider a rod stretched beyond its yield point. It will not regain its original length due to permanent deformation. Even after load removal, the rod does not entirely lose stress because of uneven plastic deformations, resulting in residual stresses. The computation of these stresses in structures is...
572