在轻微倾斜的近距离煤层中,层间岩石破裂的灾难性机制和控制技术
Xiaoqian Yuchi1, Xuanhong Du2, Pan Shu2
1School of New Energy, Longdong University, Qingyang, Gansu, 745000, People's Republic of China. 13484519960@163.com.
Scientific reports
|November 17, 2025
概括
煤矿开采过程中硬岩石断裂会导致动态灾害. 这项研究表明,增加过载负载,更长的横梁和更硬的结构放大了能量释放,导致了强大的采矿压力. 预防包括注入水和砍伐屋顶.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 岩石机械学 岩石机械学
- 地质物理学 地质物理学
背景情况:
- 煤炭开采中的动态灾害通常是由硬岩层破裂引发的.
- 由于超负荷应力动态,轻微倾斜的近距离煤层面临着独特的挑战.
研究的目的:
- 在煤矿开采过程中,研究硬岩层在反向梯形超负荷下发生的断裂演变.
- 分析在这样的地质条件下导致动态灾害诱导的因素.
主要方法:
- 数字模拟来建模岩层的行为.
- 微观地震监测以检测骨折事件.
- 使用悬臂束模型进行机械分析,以导出断裂方程并量化能量释放.
主要成果:
- 建立了层间岩层的悬臂束模型,并得出了关键断裂状态方程.
- 在断裂时释放量化的弹性能量,将其与超负荷,悬臂长度和梁度联系起来.
- 确定增加的负载,更长的梁和更硬的结构放大了灾害引起的能量,增加了采矿压力.
结论:
- 超负荷负载,悬臂结构特性和能量释放之间的相互作用显著影响采矿压力.
- 综合预防策略,包括注水软化和喷射屋顶切割,可以有效地减轻动态危险.
更多相关视频
相关概念视频
Quarrying of Stone
497
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
497
Microcracking in Concrete
414
Microcracking in concrete refers to the tiny cracks that can form within the material even before any external load is applied. These microcracks typically occur at the interface between the coarse aggregate and the hydrated cement paste, often as a result of differential volume changes prompted by variations in stress-strain behavior, as well as thermal and moisture movement. Initially, these microcracks remain stable and do not grow substantially until the concrete is stressed to about 30...
414
Placing Concrete
456
The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
456
Behavior of Concrete Under Compressive Load
562
Concrete exhibits specific behaviors under different compressive loads. Understanding this is crucial for understanding its structural integrity. When concrete undergoes uniaxial compression, it tends to develop cracks that run parallel to the direction of the force. These parallel cracks stem from localized tensile stresses that occur perpendicular to the compression direction. Additionally, angled cracks may appear due to the formation of shear planes.
As the concrete specimen fractures under...
As the concrete specimen fractures under...
562
Preplaced Aggregate Concrete
351
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
351
Design Example: Maintaining Level of an Embankment
388
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
388