基于模糊的综合评估方法,研究了地浸入煤层工作面的合理长度
Huiyang Zhang1, Zhongping Guo2, Fei Ma3
1School of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao, 266590, Shandong, China.
Scientific reports
|November 26, 2025
概括
通过使用成本因素和安全标准来确定最佳工作面长度,结果是长度为260米. 这种长度可以减少屋顶应力,机械磨损,并确保可靠的煤运行.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 运营研究 运营研究
背景情况:
- 优化工作面长度对于经济可行性和采矿安全至关重要.
- 煤层急剧下沉给运营效率和稳定带来了独特的挑战.
- 以前的方法缺乏经济和安全因素的全面整合.
研究的目的:
- 为了确定最佳的工作面长度,用于地浸泡煤层.
- 评估工作面长度对屋顶应力,机械磨损和沉降的影响.
- 验证采矿业务的多标准决策方法.
主要方法:
- 分析层次过程 (AHP) 用于因素加权.
- 用于客观数据分析的变化系数 (COV).
- 模糊的数学用于处理不确定性.
- 数字模拟和现场数据收集.
主要成果:
- 确定了260米的最佳工作面长度.
- 260米的面长表明,屋顶应力水平有所降低.
- 机械磨损减少,屋顶沉降控制在0.37米以下.
- 在预测和实际压力分布之间观察到很高的一致性.
结论:
- 集成的AHP,COV和模糊数学方法可靠地确定最佳工作面长度.
- 工作面长度为260米,可提高运营安全性和经济效率,在的煤层中进行沉浸.
- 这些发现为优化在具有挑战性的地质条件下采矿参数提供了经过验证的方法.
相关概念视频
Design Example: Maintaining Level of an Embankment
388
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
388
Compacting Factor test
528
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
528
Field Procedure for Staking Out Curves
419
Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
419
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
270
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
270
Adjusting a Traverse
349
In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
349
Design Example: Managing Concrete Workability
281
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
281