基于STFT-ResBIGRUNet的高压变压器的多式融合故障诊断
Jindou Yuan1, Chang Liu2, Bowen Zheng2
1State Key Laboratory of Power Grid Safety (China Electric Power Research Institute Co., Ltd.), Beijing, 100192, China. yuanjindou@126.com.
Scientific reports
|November 29, 2025
概括
一种新方法使用多源信息融合用于高压变压器故障诊断. 在复杂的电力系统中,STFT-ResBiGRUNet模型提高了准确性和可靠性.
科学领域:
- 电气工程 电气工程
- 电力系统分析 分析 分析
- 在工程领域的人工智能.
背景情况:
- 高压变压器对于电力系统的稳定性和安全性至关重要.
- 复杂的操作环境和不同的负载挑战了变压器的可靠性.
- 单信号故障诊断对于现代电力系统来说是不够的.
研究的目的:
- 开发用于高压变压器的智能故障诊断方法.
- 通过使用多源信息融合,提高诊断准确性和全面性.
- 解决传统故障诊断技术的局限性.
主要方法:
- 提出了一种多来源信息融合方法:STFT-ResBiGRUNet.
- 使用了短时间弗里埃变换 (STFT),残余网络 (ResNet18) 和双向门式反复单位 (BiGRU).
- 集成高效通道注意力 (ECA) 机制用于使用电气和环境数据增强特征表示.
主要成果:
- 该STFT-ResBiGRUNet模型在故障诊断中实现了高精度和稳定性.
- 与最先进的分类模型相比,表现出优越的性能,特别是在杂的环境中.
- 成功地将本地特征提取与全球时间依赖模型相结合.
结论:
- 多源信息融合显著提高了高压变压器故障诊断.
- 拟议的STFT-ResBiGRUNet模型为复杂的电力系统提供了智能和准确的解决方案.
- 这种方法提供了一种可靠的方法来确保电力基础设施的稳定性和安全性.
相关概念视频
Power System Three-Phase Short Circuits
504
Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
504
Instrument Transformers
426
Instrument transformers, comprising voltage transformers (VTs) and current transformers (CTs), play crucial roles in power substations by providing isolated replicas of current or voltage for measurement and protection purposes. Voltage transformers reduce the primary voltage to levels suitable for relay operation and measurement, while current transformers scale down the primary current. The primary winding of a current transformer often consists of a single turn, achieved by threading the...
426
Energy Losses in Transformers
1.3K
In an ideal transformer, it is assumed that there are no energy losses, and, hence, all the power at the primary winding is transferred to the secondary winding. However, in reality, the transformers always have some energy losses, and, hence, the output power obtained at the secondary winding is less than the input power at the primary winding due to energy losses.
There are four main reasons for energy losses in transformers.
The first cause can be the high resistance of the...
There are four main reasons for energy losses in transformers.
The first cause can be the high resistance of the...
1.3K
Three-Phase Short Circuit—Unloaded Synchronous Machine
645
Conducting a three-phase short circuit test on an unloaded synchronous machine helps understand its impact on the system. The AC fault current's oscillogram, with the DC offset removed, reveals that the waveform amplitude decreases from an initially high value to a steady-state level for one phase of the machine.
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
645
Equivalent Circuits for Practical Transformers
1.3K
The practical equivalent circuits of single-phase two-winding transformers exhibit significant deviations from their idealized versions due to the inherent properties of winding resistance and finite core permeability. These properties result in real and reactive power losses, affecting the transformer's performance. Understanding these deviations is crucial for designing more efficient transformers.
In a practical transformer, each winding exhibits resistance and leakage reactance. The...
In a practical transformer, each winding exhibits resistance and leakage reactance. The...
1.3K
Bus Impedance Matrix
488
Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
488