概括
尽量减少固化尖端距离和增加光照时间显著改善后部复合树脂微硬度. 牙修复的最佳结果是通过更短的距离和更长的固化时间来实现,以提高耐用性.
科学领域:
- 牙科材料科学 牙科材料科学
- 聚合物化学 聚合物化学
- 恢复性牙科 恢复性牙科
背景情况:
- 复合树脂在修复牙科中至关重要,微硬度表明耐用性.
- 固化光距离和曝光时间影响复合物聚合.
- 优化这些因素对于成功的牙科修复至关重要.
研究的目的:
- 评估不同固化尖端距离和暴露时间对后部复合树脂微硬度的影响.
- 为了确定增强聚合和恢复寿命的最佳参数.
主要方法:
- 使用SureFilTM后部复合树脂进行体外研究.
- 60个样本在1,3,5和8毫米的距离上经过40秒,60秒或80秒的固化.
- 使用维克斯硬度测试仪测量微硬度,在24小时的水合后进行测量.
主要成果:
- 微硬度随着固化距离的增加显著下降 (p < 0.001).
- 观察到的微硬度在1毫米距离以80秒的曝光时最高;在8毫米以40秒的曝光时最低.
- 较长的曝光时间 (80年代) 始终改善了所有距离的微硬度.
结论:
- 将固化尖端距离最小化到1-3毫米,并将曝光时间延长到≥60秒,可显著提高复合材料的微硬度.
- 这些参数优化了聚合,从而提高后部复合材料修复的临床耐用性.
更多相关视频
07:42Quasistatic Mechanical Testing for Computer-Aided Design and Manufacturing Occlusal Veneers Cemented to Milled Dentin Analog Material
Published on: December 20, 2024
693
05:30Roughness Impact of Piezoelectric Dental Scaler on Two Distinct Flowable Composite Filling Materials
Published on: January 10, 2025
1.0K
相关概念视频
Curing of Concrete
338
The hydration of cement takes place within the water-filled capillary pores. However, environmental elements can disrupt this process by evaporating water from the concrete surfaces. Sealed concrete with a water-cement ratio below 0.5 experiences self-desiccation, leading to water loss. The water loss in concrete is mitigated by curing. This technique involves keeping the concrete saturated to maintain the necessary temperature and moisture conditions, to optimally fill the spaces in the cement...
338
Accelerated Curing of Concrete
431
Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
431
Curing Methods
264
Concrete members with a small surface-to-volume ratio are cured by oiling and moistening the forms before casting the concrete member. These forms can be left in place for a prolonged period to prevent moisture loss, and can be wetted if made of a material suitable for wetting. If the forms are removed early, the concrete member is moistened and covered with polythene sheets to maintain moisture. For large horizontal concrete surfaces exposed to dry weather, a temporary covering is suspended...
264
Testing Water Quality
330
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
330