Federica Fonda1, Maria Petrillo2, Giovanni Bacaro3
1Department of Life Science, University of Trieste, Trieste, Italy. federica.fonda@gmail.com.
Environmental management
|December 27, 2025
概括
像水力发电这样的可再生能源项目导致息地丧失. 本研究引入了一个框架,将森林连接纳入环境影响评估 (EIA) 中,并指导为生物多样性保护重新造林.
科学领域:
- 生态生态学 生态生态学
- 保护生物学 保护生物学
- 环境规划 环境规划
背景情况:
- 可再生能源的发展,特别是水电,经常导致陆地息地丧失和碎片化,影响生物多样性.
- 当前的环境影响评估 (EIA) 经常低估或忽视息地碎片化对生物多样性的影响.
- 森林息地连接对于维持生物多样性和生态系统功能至关重要,但未被一致地纳入规划.
研究的目的:
- 提出和应用一个新的框架,将森林息地连接性纳入环境影响评估和环境规划.
- 评估水电项目对森林息地连接在景观规模的影响.
- 开发一个空间优先级的方法来恢复森林,以恢复野生动物的连接.
主要方法:
- 开发了一个框架,比较建筑前和建筑后的森林息地连接.
- 使用连接的综合指数 (IIC) 进行了空间分析,以优先考虑再造林地点.
- 评估了野生动物物种在多个分散距离 (500米,1公里,2公里) 的连接性.
主要成果:
- 尼泊尔一项拟议的水力发电项目导致了在项目足迹 (长达15公里) 内的和超越的森林息地连接的重大损失.
- 确定了94.1平方公里的受该项目影响的森林砍伐地区.
- 在景观和河岸层面优先考虑的复林地点,分别为15%和36%,在分散距离上被确定为首要优先级.
结论:
- 在环境影响评估和环境规划中明确纳入息地连接,对于有效的生物多样性保护至关重要.
- 基于连接的优先级提供了一种可靠的方法来指导植林补偿.
- 这种方法可以帮助平衡能源发展需求与保护生物多样性的必要性.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
268
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
268
Habitat Fragmentation
20.9K
Habitat fragmentation describes the division of a more extensive, continuous habitat into smaller, discontinuous areas. Human activities such as land conversion, as well as slower geological processes leading to changes in the physical environment, are the two leading causes of habitat fragmentation. The fragmentation process typically follows the same steps: perforation, dissection, fragmentation, shrinkage, and attrition.
20.9K
Maximum Power Flow and Line Loadability
570
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
570
Responses to Drought and Flooding
11.9K
Water plays a significant role in the life cycle of plants. However, insufficient or excess of water can be detrimental and pose a serious threat to plants.
11.9K
Fast Decoupled and DC Powerflow
705
The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
705
Conservation of Declining Populations
12.5K
Conservation of declining population focuses on ways of detecting, diagnosing, and halting a population decline. The approach uses methods to prevent populations from going extinct.