纠正:可持续管理近场爆炸引起的地面振动,以提高印度矿山的石灰岩开采潜力 - 一个案例研究

Aditya Rana1, Arvind Kumar Gond2, Saikat Banerjee2

  • 1Rock Excavation Engineering, CSIR - Central Institute of Mining and Fuel Research, Dhanbad, 826001, India. adityarana.cimfr@csir.res.in.

Environmental geochemistry and health
|January 4, 2026
PubMed
概括

No abstract available in PubMed .

更多相关视频

Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
11:14

Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent

Published on: February 21, 2017

12.8K
Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
06:34

Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

Published on: October 25, 2017

8.3K

相关实验视频

Last Updated: Jan 7, 2026

Blast Quantification Using Hopkinson Pressure Bars
09:41

Blast Quantification Using Hopkinson Pressure Bars

Published on: July 5, 2016

9.4K
Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
11:14

Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent

Published on: February 21, 2017

12.8K
Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
06:34

Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

Published on: October 25, 2017

8.3K

相关概念视频

Quarrying of Stone01:15

Quarrying of Stone

482
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
482
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

378
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
378
JoVE
关于 JoVE
概览领导团队博客JoVE 帮助中心
作者
出版流程编辑委员会范围与政策同行评审常见问题投稿
图书馆员
用户评价订阅访问资源图书馆顾问委员会常见问题
研究
JoVE JournalMethods CollectionsJoVE Encyclopedia of Experiments存档
教育
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab Manual教师资源中心教师网站
使用条款与条件
隐私政策
政策
Jove
Visualize
联系我们