一个基于机器学习的动态SST指数,用于在秘鲁亚马逊地区长期预测疟疾

Mengxin Pan1,2, Shineng Hu1, Mark M Janko3

  • 1Nicholas School of the Environment Duke University Durham NC USA.

GeoHealth
|January 19, 2026
PubMed
概括

热带海面温度 (SST) 的变化可以预测秘鲁亚马逊地区的疟疾. 使用动态SST指数的新机器学习模型比传统方法提供了改进的长线疟疾预测.

相关概念视频

Constructing and Visualizing Models using Mime-based Machine-learning Framework06:19

Constructing and Visualizing Models using Mime-based Machine-learning Framework

Mime is a flexible computational framework to construct a machine learning-based integration model with elegant performance. Here, we provide a detailed step-by-step procedure for developing predictive models with high accuracy, leveraging complex datasets to identify critical genes associated with disease progression, patient outcomes, and therapeutic response.
2.3K
Asthma Detection Research Based on Voice Signal Processing and Machine Learning04:04

Asthma Detection Research Based on Voice Signal Processing and Machine Learning

This study employed voice signal analysis and machine learning methods, utilizing MATLAB to extract distinctive voice features for non-invasive early detection of asthma. The Support Vector Machine (SVM) and Random Forest (RF) algorithms demonstrated comparable performance in terms of overall classification accuracy, although SVM may achieve a better balance between sensitivity and...
939
Comparison of Predictive Performance of Three Lymph Node Staging Systems in Colorectal Signet Ring Cell Carcinoma Based on Machine Learning Model07:13

Comparison of Predictive Performance of Three Lymph Node Staging Systems in Colorectal Signet Ring Cell Carcinoma Based on Machine Learning Model

This study evaluates prognostic systems for colorectal signet-ring cell carcinoma patients using machine learning models and competing risk analyses. It identifies log odds of positive lymph nodes as a superior predictor compared to pN staging, demonstrating strong predictive performance and aiding clinical decision-making through robust survival prediction...
495
Predicting Treatment Response to Image-Guided Therapies Using Machine Learning: An Example for Trans-Arterial Treatment of Hepatocellular Carcinoma04:09

Predicting Treatment Response to Image-Guided Therapies Using Machine Learning: An Example for Trans-Arterial Treatment of Hepatocellular Carcinoma

Intra-arterial therapies are the standard of care for patients with hepatocellular carcinoma who cannot undergo surgical resection. A method for predicting response to these therapies is proposed. The technique uses pre-procedural clinical, demographic, and imaging information to train machine learning models capable of predicting response prior to...
8.6K
A Live-cell Image-Based Machine Learning Strategy to Monitor Pluripotent Stem Cell Differentiation11:38

A Live-cell Image-Based Machine Learning Strategy to Monitor Pluripotent Stem Cell Differentiation

Available pluripotent stem cell (PSC)-to-functional cell differentiation systems are currently impeded by problems of severe line-to-line and batch-to-batch variability. Here, using cardiac differentiation as the main example, we present a protocol to intelligently monitor and modulate the process of PSC differentiation based on image-based machine learning.
1.1K
Machine Learning Algorithms for Early Detection of Bone Metastases in an Experimental Rat Model07:15

Machine Learning Algorithms for Early Detection of Bone Metastases in an Experimental Rat Model

This protocol was designed to train a machine learning algorithm to use a combination of imaging parameters derived from magnetic resonance imaging (MRI) and positron emission tomography/computed tomography (PET/CT) in a rat model of breast cancer bone metastases to detect early metastatic disease and predict subsequent progression to...
7.4K