修改现有的各种作物中对prothioconazole的最大残留量水平
EFSA journal. European Food Safety Authority
|January 22, 2026
概括
对各种作物进行了对前列康纳的最大残留量 (MRL) 的审查. 欧洲食品安全局 (EFSA) 得出的结论是,食用残留物不太可能对消费者造成健康风险.
科学领域:
- 农业科学 农业科学
- 食品安全 食品安全
- 环境科学 环境科学
背景情况:
- 欧盟396/2005条例规定了食品中的农药残留物限值.
- 西普卡姆Oxon SpA要求对prothioconazole进行MRL修改.
- 希腊现有的MRL受到审查.
研究的目的:
- 评价针对prothioconazole提出的最大残留量 (MRL).
- 评估各种食品中的prothioconazole残留物的安全性.
- 确保遵守欧洲食品安全法规.
主要方法:
- 分析了由Sipcam Oxon SpA提交的数据.
- 进行了对prothioconazole及其代谢物的风险评估.
- 对残留物检测的分析方法得到了验证.
主要成果:
- 提供了足够的数据,提出了对果,杏子,桃,梅子,黄瓜和大米的MRL.
- 有验证的分析方法可用,其量化限制为0.01 mg/kg.
- 摄入Prothioconazole残留物不太可能带来任何风险.
结论:
- 提议的prothioconazole的MRL得到了提交的数据的支持.
- 目前用于使用prothioconazole的农业做法被认为对消费者来说是安全的.
- 欧盟食品安全局的评估证实了在拟议的MRL范围内使用prothioconazole残留物的安全性.
相关概念视频
Maximum Deflection
1.0K
When analyzing beams under unsymmetrical loads, such as a train moving on a bridge, it is crucial to accurately determine the points of maximum stress and deflection. The process involves identifying the maximum deflection of the beam, which may not always occur at its midpoint due to the uneven distribution of the load.
The maximum deflection occurs at a specific point, known as point O, where the tangent to the deflection curve is horizontal. To find point O, the slope of the tangent at any...
The maximum deflection occurs at a specific point, known as point O, where the tangent to the deflection curve is horizontal. To find point O, the slope of the tangent at any...
1.0K
Residual Stresses
603
Residual stresses reside in a structure even after removing the original stress inducer. This phenomenon often arises from varied plastic deformations across different parts of a structure. Consider a rod stretched beyond its yield point. It will not regain its original length due to permanent deformation. Even after load removal, the rod does not entirely lose stress because of uneven plastic deformations, resulting in residual stresses. The computation of these stresses in structures is...
603
Residual Plots
6.2K
A residual plot is a statistical representation of data used to analyze correlation and regression results. It helps verify the requirements for drawing specific conclusions about correlation and regression. To obtain the residual plot, first, the residual for each data value is calculated, which is simply the vertical distance between the observed and the predicted value obtained from the regression equation.
When the residual values are plotted against the variable x, it is called a residual...
When the residual values are plotted against the variable x, it is called a residual...
6.2K
Maximum Power Transfer
847
Numerous practical applications within engineering disciplines, such as telecommunications, necessitate optimizing power delivery to a connected load. This pursuit, however, entails inherent internal losses, which can either equal or exceed the power supplied to the load. The Thevenin equivalent circuit is helpful in finding the maximum power a linear circuit can deliver to a load. It is assumed in this context that the load resistance can be adjusted.
By substituting the entire circuit with...
By substituting the entire circuit with...
847
Histone Modification
16.0K
The histone proteins have a flexible N-terminal tail extending out from the nucleosome. These histone tails are often subjected to post-translational modifications such as acetylation, methylation, phosphorylation, and ubiquitination. Particular combinations of these modifications form “histone codes” that influence the chromatin folding and tissue-specific gene expression.
Acetylation
The enzyme histone acetyltransferase adds acetyl group to the histones. Another enzyme, histone...
Acetylation
The enzyme histone acetyltransferase adds acetyl group to the histones. Another enzyme, histone...
16.0K
Maximum Size of Aggregate
528
The maximum size of aggregate is defined as the aperture of the sieve retaining 15 percent or more of the particles present in the aggregate sample. The aggregate's maximum size impacts the concrete's water requirement, workability, and strength. Larger aggregates reduce the surface area needing cement paste coverage, which can lower water needs, thereby allowing a decrease in the water-to-cement ratio when the desired workability and richness of the mix are to be maintained, which can...
528


