在民用基础设施中实时监控裂的轻量级框架
Vindhyesh Pandey1, S S Mishra1
1Department of Civil Engineering, National Institute of Technology Patna, Bihar 800005, India.
Ultrasonics
|January 23, 2026
概括
这项研究定制了YOLOv11用于混凝土裂检测,提高了速度和准确性. 改进后的模型为结构健康监测提供了一个计算效率高的解决方案.
科学领域:
- 土木工程 土木工程是指土木工程.
- 计算机视觉 计算机视觉
- 人工智能的人工智能
背景情况:
- 在混凝土结构中手动检测裂是劳动密集型的,容易出错.
- 像YOLO (你只看一次) 这样的自动化技术提供了更高的准确性和效率.
- 在YOLO系列 (YOLOv4-YOLOv11) 的进步旨在提高对象检测的性能.
研究的目的:
- 将YOLOv11定制为增强的混凝土裂检测.
- 提高结构监测中裂识别的速度,准确性和回忆.
- 为实时应用程序开发一个计算高效和强大的模型.
主要方法:
- 使用数据增强,超参数优化和转移学习来定制YOLOv11.
- 在包括SDNET2018在内的复合数据集上进行培训和验证.
- 对基线模型YOLOv5,YOLOv8,YOLOv9,YOLOv10和YOLOv11.1进行比较分析.
主要成果:
- 实现了平均平均精度 (mAP50) 的68.6%,超过YOLOv11的3.47%.
- 获得了80.8%的精度和63.6%的回忆率.
- 与其他模型相比,使用更少的层 (100) 和GFLOP (6.3) 证明了计算效率.
结论:
- 定制的YOLOv11模型对于混凝土裂检测非常有效.
- 该模型具有计算效率,适合实时结构健康监测.
- 它在具有挑战性的条件下表现出强性,使其成为基础设施评估的宝贵工具.
相关概念视频
Real Time RT-PCR
64.9K
Real-time reverse transcription-polymerase chain reaction, or Real-time RT-PCR, is an analytical tool used to determine the expression level of target genes. The method involves converting mRNA to complementary DNA with the help of an enzyme known as reverse transcriptase, followed by the PCR amplification of the cDNA. These two processes can be performed simultaneously in a single tube or separately as a two-step reaction.
The real-time quantification of the number of amplified products is...
The real-time quantification of the number of amplified products is...
64.9K
Types of Non-structural Cracks in Concrete
488
Non-structural cracks are primarily of three types: plastic, early-age thermal, and drying shrinkage cracks. Plastic cracks are further classified into plastic shrinkage cracks and plastic settlement cracks.
Plastic shrinkage cracks typically form within hours after the concrete is poured. The concrete's surface dries faster than the bottom, creating tensile stress that the still-plastic concrete cannot withstand, leading to diagonal or randomly patterned cracks on the concrete surface.
Plastic shrinkage cracks typically form within hours after the concrete is poured. The concrete's surface dries faster than the bottom, creating tensile stress that the still-plastic concrete cannot withstand, leading to diagonal or randomly patterned cracks on the concrete surface.
488
Self-Presentation: Self-Monitoring and Self-Handicapping
43.5K
People can go to great lengths to protect their self-image and present themselves in ways that they want others to see them. Sociologist Erving Goffman presented the idea that a person is like an actor on a stage. Calling his theory dramaturgy, Goffman believed that we use “impression management” to present ourselves to others as we hope to be perceived. Each situation is a new scene, and individuals perform different roles depending on who is present (Goffman, 1959). Think about...
43.5K
Holter Monitor: 24-Hour Monitoring
2.3K
Holter monitoring is a continuous electrocardiography (ECG) recording that tracks the heart's electrical activity over an extended period, generally 24 to 48 hours. This noninvasive diagnostic tool detects irregular heart rhythms that may not be captured during a standard ECG performed in a clinical setting.DeviceThe Holter monitor is a portable, small device connected to several electrodes on the patient's chest. These electrodes detect the heart's electrical signals and transmit them to the...
2.3K
Generation Time
1.4K
Bacterial generation time, the period required for a bacterial population to double during its exponential growth phase, serves as a critical measure of microbial growth dynamics under optimal conditions. This parameter varies significantly across bacterial species and can be influenced by factors such as temperature, pH, and the availability of nutrients. For example, Escherichia coli can achieve a generation time of approximately 20 minutes, while Mycobacterium tuberculosis exhibits a much...
1.4K
Mixing Time
475
The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
475