解开资源水平和温度依赖对不同品牌鱼类表现的影响

Bass Dye1,2,3, Myron A Peck1,4, Karen E van de Wolfshaar2

  • 1Department of Coastal Systems, NIOZ Royal Netherlands Institute for Sea Research, P.O. Box 59, 1790 AB, Den Burg, Texel, The Netherlands.

Conservation physiology
|January 30, 2026
PubMed
概括

资源的可用性,而不是温度,最影响鱼类的生长和生存. 这种生态生理模型有助于海洋物种适应气候变化,预测对鱼类种群的影响.

相关概念视频

Temperature Dependence on Reaction Rate02:55

Temperature Dependence on Reaction Rate

The Collision Theory
Atoms, molecules, or ions must collide before they can react with each other. Atoms must be close together to form chemical bonds. This premise is the basis for a theory that explains many observations regarding chemical kinetics, including factors affecting reaction rates.
The collision theory is based on the postulates that (i) the reaction rate is proportional to the rate of reactant collisions, (ii) the reacting species collide in an orientation allowing contact between...
89.0K
Effects of Temperature on Free Energy02:11

Effects of Temperature on Free Energy

The spontaneity of a process depends upon the temperature of the system. Phase transitions, for example, will proceed spontaneously in one direction or the other depending upon the temperature of the substance in question. Likewise, some chemical reactions can also exhibit temperature-dependent spontaneities. To illustrate this concept, the equation relating free energy change to the enthalpy and entropy changes for the process is considered:
28.2K
Temperature Dependent Deformation01:12

Temperature Dependent Deformation

In a nonhomogeneous rod made up of steel and brass, restrained at both ends and subjected to a temperature change, several steps are involved in calculating the stress and compressive load. Due to the problem's static indeterminacy, one end support is disconnected, allowing the rod to experience the temperature change freely. Next, an unknown force is applied at the free end, triggering deformations in the rod's steel and brass portions. These deformations are then calculated and added...
394
Atomic Spectroscopy: Effects of Temperature01:27

Atomic Spectroscopy: Effects of Temperature

Atomization, converting samples into gas-phase atoms and ions, is essential for atomic spectroscopy. The flame temperature required for atomization affects the efficiency of the atomic spectroscopic methods by increasing the atomization efficiency and the relative population of the excited and ground states.
At thermal equilibrium, the relative populations of excited and ground state atoms can be estimated using the Maxwell–Boltzmann distribution. For example, an increase in temperature...
903
Osmoregulation in Fishes02:32

Osmoregulation in Fishes

When cells are placed in a hypotonic (low-salt) fluid, they can swell and burst. Meanwhile, cells in a hypertonic solution—with a higher salt concentration—can shrivel and die. How do fish cells avoid these gruesome fates in hypotonic freshwater or hypertonic seawater environments?
53.1K