概括
适应性流域管理是复杂的. 一个新的混合系统结合了间隔估值的模糊混合SWOT (IVFH-SWOT) 和弹性指标的模糊评估 (FERM),有效地优先考虑不确定性下的可持续管理策略.
科学领域:
- 环境科学与环境管理
- 水资源工程水资源工程
- 决策分析 决策分析
背景情况:
- 适应性流域管理由于气候变化和人类活动而面临复杂性.
- 传统的SWOT分析很难量化适应性管理中的不确定性.
- 对于可持续的河流流域管理,需要强大的决策支持系统.
研究的目的:
- 为适应性流域管理引入混合决策支持系统.
- 将区间估值模糊混合SWOT (IVFH-SWOT) 分析与弹性指标的模糊评估 (FERM) 结合起来.
- 评估和优先考虑适应性可持续性的战略选择.
主要方法:
- 开发一个混合决策支持系统,整合IVFH-SWOT和FERM.
- 在四个适应性可持续性方面评估了11个战略选择.
- 通过多利益相关者分析来确定战略的优先级.
主要成果:
- 混合系统有效评估了适应性流域管理的战略选择.
- 确定的主要战略包括大运营法规,废水基础设施处理和水电开发.
- 调查结果突出了在不确定性下弹性和可持续性之间的权衡.
结论:
- 拟议的框架为适应性可持续流域管理提供了一个强大的工具.
- 混合系统解决了在不确定的环境中传统SWOT分析的局限性.
- 该框架可用于从业人员和参与水资源管理的政策制定者.
相关概念视频
Sustainable Development
15.1K
As the human population continues to grow and use resources, we must be mindful of our planet’s natural limits. Sustainable development provides a pathway to maintain and improve human life now while also ensuring that future generations will have the resources that they need. The long-term success of sustainability efforts rests on understanding the interplay between human actions and ecological systems.
15.1K
Indeterminate Structure
1.5K
Indeterminate structures refer to structures where internal forces and reactions cannot be determined using only the equations of static equilibrium. Indeterminate structures have more unknown forces and reaction forces than equations of static equilibrium that can be used to determine them. Indeterminate structures are often used in engineering to create complex, efficient, and aesthetically pleasing structures. There are various types of indeterminate structures used in engineering and...
1.5K
Indeterminate Products
52
Indeterminate forms also arise in the evaluation of limits involving products, particularly when one factor approaches zero while the other tends to positive or negative infinity. This situation, commonly described as a zero-times-infinity form, does not have an immediately interpretable outcome. Depending on how the factors behave relative to one another, the limit of such a product may be zero, infinite, or a finite nonzero value.Product Limits and Algebraic RewritingTo analyze limits of this...
52
Statically Indeterminate Problem Solving
722
Statically indeterminate problems are those where statics alone can not determine the internal forces or reactions. Consider a structure comprising two cylindrical rods made of steel and brass. These rods are joined at point B and restrained by rigid supports at points A and C. Now, the reactions at points A and C and the deflection at point B are to be determined. This rod structure is classified as statically indeterminate as the structure has more supports than are necessary for maintaining...
722
Indeterminate Forms and L’Hôpital’s Rule
114
Indeterminate forms occur when evaluating limits leads to expressions that cannot be directly interpreted, such as zero divided by zero or infinity divided by infinity. These results do not describe the true behavior of a function near a given point and instead signal that additional analysis is required. L’Hôpital’s Rule provides a reliable method for resolving such ambiguities by replacing the original functions with their derivatives.Core Idea of L’Hôpital’s...
114
Design Example: Sustainability in Concrete Building
416
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...