一个全面的框架来评估桥梁项目通过获得价值管理 (EVM) 和建筑信息建模 (BIM) 重新设计
Sara M Elseufy1, Ayman Hussein2, Mohamed Badawy2
1Structural Engineering Department, Faculty of Engineering, Ain Shams University, Cairo, Egypt. Sara.elseufy2292@outlook.com.
Scientific reports
|February 14, 2026
概括
建筑信息建模 (BIM) 显著减少了桥梁施工中的重工,从而大大节省了70-85%的时间,并降低了65-75%的成本. 这提高了项目的时间表和成本表现.
科学领域:
- 建设管理建设管理.
- 土木工程 土木工程是指土木工程.
- 在建筑行业的信息技术.
背景情况:
- 重新工作对项目交付构成重大挑战,影响成本,时间表和资源效率.
- 尽量减少重工对于改善建筑行业项目成果至关重要.
研究的目的:
- 调查建筑信息建模 (BIM) 对减少桥梁施工重工的影响.
- 量化BIM对重工比率,成本和时间表表表现的影响.
主要方法:
- 对具有和没有BIM实施的桥梁项目进行比较分析.
- 采用了采访前后,数据分析和获得价值管理 (EVM).
- 评估的重工比率,时间浪费,成本节省,时间表绩效指标 (SPI) 和成本绩效指标 (CPI).
主要成果:
- 据估计,BIM采用导致时间浪费减少了70-85%,成本节省了65-75%.
- 获得价值管理 (EVM) 分析显示有所改善:SPI增长了0.264,CPI增长了0.216.
- 通过BIM实施,观察到与重工相关的低效率的显著缓解.
结论:
- 通过减轻重工,BIM有可能提高桥梁建设的成本和时间表结果.
- 通过启用BIM的项目管理实践,可以提高项目交付效率.
- 结果取决于环境,根据项目的规模,范围和实施策略而有所不同.
相关概念视频
Design Example: Strain Gauge Bridge or Wheatstone Bridge
1.1K
The utilization of strain gauges as transducers for converting mechanical strain into electrical signals is a common practice in various engineering applications. These strain gauges are frequently integrated into Wheatstone bridge circuits to accurately measure parameters such as force or pressure. Within this context, each element within the circuit exhibits a resistance that undergoes subtle variations when subjected to mechanical strain. The primary objective is to convert minuscule...
1.1K
Wheatstone Bridge
1.3K
An ohmmeter is a resistance-measuring device. It works by applying a voltage to a resistor of unknown resistance and measuring the current across the resistor. The resistance value is deduced using Ohm's law. Usually, the standard configuration of an ohmmeter comprises a voltmeter or an ammeter. However, such configurations are limited in accuracy because the meters alter the voltage applied to the resistor and the current that flows through it.
Thus, for accurate resistance measurements, a...
Thus, for accurate resistance measurements, a...
1.3K
Bridge rectifier
1.6K
The bridge rectifier is essential in electronics for efficiently converting alternating current (AC) to direct current (DC). Comprised of four diodes configured in a bridge layout, this rectifier effectively processes both the positive and negative halves of the AC waveform, making it superior to half-wave and full-wave center-tapped rectifiers in terms of voltage regulation and output stability.
Operationally, the bridge rectifier allows current flow through two of its diodes during each...
Operationally, the bridge rectifier allows current flow through two of its diodes during each...
1.6K
Fischer Projections
16.7K
Learning to draw Fischer projections of molecules and understanding their relevance plays a crucial role in the visual depiction of organic molecules. A Fischer projection is a two-dimensional projection on a planar surface to simplify the three-dimensional wedge–dash representation of molecules. This is especially helpful in the case of molecules with multiple chiral centers that can be difficult to draw. Here, all the bonds of interest are represented as horizontal or vertical lines. While...
16.7K
Cross-bridge Cycle
123.1K
As muscle contracts, the overlap between the thin and thick filaments increases, decreasing the length of the sarcomere—the contractile unit of the muscle—using energy in the form of ATP. At the molecular level, this is a cyclic, multistep process that involves binding and hydrolysis of ATP, and movement of actin by myosin.
123.1K
Newman Projections
21.7K
Different notations are used to represent the three-dimensional structure of molecules on two-dimensional surfaces. One of the most commonly used representations is the dash-wedge formula. The dashed wedges, solid wedges, and the plane lines indicate the groups situated behind the plane, coming out of the plane, and in the plane, respectively.
The organic molecules rotate across the single bonds leading to numerous temporary three-dimensional structures of varying energy known as...
The organic molecules rotate across the single bonds leading to numerous temporary three-dimensional structures of varying energy known as...
21.7K