进入梅克尔洞穴的时间前的介质前的持续时间间的方法:我是如何做到的
Sabino Luzzi1,2, Matìas Baldoncini3,4, Gianluca Lorenzo Fabozzi5,6
1Department of Medicine, Surgery, and Pharmacy, University of Sassari, Via Roma 151, 07100, Sassari, Sardinia, Italy. sluzzi@uniss.it.
Acta neurochirurgica
|February 20, 2026
概括
前中介间持续的方法提供安全的外延进入梅克尔洞穴,用于三 schwannoma 移除. 这种技术最大限度地减少了洞穴鼻的操纵,从而降低了患者的发病率.
科学领域:
- 神经外科 神经外科
- 手术解剖学手术解剖学
背景情况:
- 梅克尔洞穴是一个关键的神经外科区域,包含三角神经.
- 三角管中瘤通常需要手术干预才能得到有效的治疗.
- 直接进入梅克尔洞穴的外接入对于安全切除瘤至关重要.
研究的目的:
- 为了描述进入梅克尔洞穴的前性中介性间歇性方法.
- 突出这一手术技术的技术细微差别和解剖学里程碑.
主要方法:
- 这种方法涉及先骨切除术,以进入腹腔间空间.
- 剖析沿三神经 (V2) 进行,朝向加塞尔结节.
- 瘤切除是通过内部脱和周围剖析进行的.
主要成果:
- 这种方法可以直接进入Meckel洞穴.
- 它允许对加塞尔结节和三等根根的受控暴露.
- 如果需要,可以将瘤切除扩展到后腔.
结论:
- 前中介间持续的方法可以安全有效地去除三 schwannoma.
- 这种技术限制了洞穴鼻腔的操纵.
- 它与减少外科手术发病率有关.
更多相关视频
11:58Minimally Invasive Thumb-sized Pterional Craniotomy for Surgical Clip Ligation of Unruptured Anterior Circulation Aneurysms
Published on: August 11, 2015
16.5K
11:29Anteromesial Temporal Lobectomy for Medically Intractable Temporal Lobe Epilepsy: An Operative Study
Published on: August 15, 2025
2.5K
相关概念视频
Mean free path and Mean free time
Consider the gas molecules in a cylinder. They move in a random motion as they collide with each other and change speed and direction. The average of all the path lengths between collisions is known as the "mean free path."
Setting Time of Cement
The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
Mixing Time
The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard capacity...
