相关实验视频
Updated: Feb 24, 2026

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.7K
评估湖泊环氧化风险的方法,同时考虑水质和水量的联合影响
Chenguang Xiang1,2, Wei Huang3, Wenwu Zhang2
1State Key Laboratory of Water Cycle and Water Security, China Institute of Water Resources and Hydropower Research, Beijing, 100038, China.
Environmental monitoring and assessment
|February 23, 2026
概括
水的补充通过改善水质和数量,显著降低了湖泊缩风险. 在干旱季节满足生态水需求和补充水资源进一步降低了超过总标准的可能性.
科学领域:
- 环境科学 环境科学
- 水资源管理 水资源管理
- 临界技术 临界技术
背景情况:
- 评估湖泊缩风险对于补水规划至关重要.
- 水的补充影响湖水的数量和质量,使风险评估复杂化.
研究的目的:
- 开发一种新的方法来评估湖泊缩风险.
- 在风险评估中考虑水量和水质 (总) 的综合影响.
主要方法:
- 使用非参数核估计与模模型进行边际分布估计.
- 采用高斯的形模型来确定水补充量和总度的联合概率分布.
- 评估了10个补充场景 (不同体积和时间段) 的强化风险.
主要成果:
- 水的补充显著减轻了高海湖的肥胖风险.
- 增加的补充量降低了超过总标准的概率,在满足生态水需求时达到0.44.
- 干旱季补给场景显示,超过水质标准的可能性较低 (0.49).
结论:
- 提出的方法有效地评估了考虑到水的数量和质量的环氧化风险.
- 水的补充是管理高原湖泊中环氧化的一个可行的策略.
- 结果为类似湖泊生态系统的水资源管理和环氧化控制提供了宝贵的见解.
相关概念视频
Quality of Water
605
In concrete preparation, the quality of water is paramount as it affects the strength and durability of the concrete. Potable water is usually preferred; however, it must not have excessive sodium or potassium to prevent compromising the concrete's integrity. Water quality is typically evaluated based on impurities such as dissolved solids, chlorides, and sulfates, and its pH value is ideally between 6 and 8. Even slightly acidic natural water may be acceptable unless it contains harmful...
605
Testing Water Quality
408
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
408
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
342
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
342
Derivatives: Problem Solving
120
Temperature-Dependent Growth of Brook TroutThe growth of brook trout is closely influenced by water temperature. Experimental data demonstrate how trout weight changes over a 24-day period in response to varying water temperatures. At lower temperatures, such as 15.5 degrees Celsius, brook trout show significant weight gain. However, as the temperature increases, the amount of weight gained steadily decreases. At the highest temperature measured, 24.4 degrees Celsius, trout experience a net...
120

