相关实验视频
Updated: Feb 25, 2026

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.7K
在水资源管理中的混合区概念的未来防护:一个工业的视角
Thomas Denis Collin1, Simon Gibbons1, Meg O'Donnell2
1ERM UK, 2nd Floor Exchequer Court, 33 St Mary Axe, London, EC3A 8AA, UK.
Environmental science and pollution research international
|February 23, 2026
概括
由于实施不均,欧洲水域的混合区面临审查. 环境变化和工业实践需要统一的指导方针,以实现有效的废水管理.
科学领域:
- 环境科学 环境科学
- 水资源管理 水资源管理
- 监管事务 监管事务
背景情况:
- 混合区允许接收水域有限的环境质量标准超越.
- 它们在欧洲的应用是不一致的,并且越来越多地受到审查.
- 环境变化,监管转变和工业用水使用影响混合区的可行性.
研究的目的:
- 评估混合区的未来可行性,考虑到环境变化,监管演变和工业实践.
- 评估欧洲工业环境中混合区的当前实施情况和挑战.
- 确定对协调指导和气候适应性评估方法的需求.
主要方法:
- 监管和技术指导的跨欧洲评估.
- 调查了14个国家的22个燃料制造设施.
- CORMIX近场建模用于测试参数灵敏度.
主要成果:
- 在允许条件,排放限制和审查频率方面观察到显著的变化.
- 目前,只有四个被调查的设施使用混合区,但预计将来会依赖.
- 废水和环境密度,流量模式和温度极大地影响混合区尺寸和稀释.
结论:
- 协调的指导对于一致的混合区应用至关重要.
- 纳入大规模装载考虑和气候弹性方法至关重要.
- 确保混合区在工业废水管理中的长期适用性需要适应性战略.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
342
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
342
Design Example: Managing Concrete Workability
319
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
319
Multiple Pipe Systems
1.3K
Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
1.3K
Quality of Water
606
In concrete preparation, the quality of water is paramount as it affects the strength and durability of the concrete. Potable water is usually preferred; however, it must not have excessive sodium or potassium to prevent compromising the concrete's integrity. Water quality is typically evaluated based on impurities such as dissolved solids, chlorides, and sulfates, and its pH value is ideally between 6 and 8. Even slightly acidic natural water may be acceptable unless it contains harmful...
606
Design Example: Design of an Irrigation Channel
923
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
923
Testing Water Quality
417
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
417

