:,

María Cristina Luna-Iglesias1, Juan Carlos Camacho-Vega1,2, Juan Gómez-Salgado3,4

  • 1Department of Building Construction II, Higher Technical School of Building Engineering, University of Seville, Seville, Spain.

Medicine
|February 24, 2026
PubMed
概括

将建筑信息建模 (BIM) 与真实数据相结合,可以改善重症监护室 (ICU) 的疏散模拟. 校准模型准确地预测疏散时间,并识别由架构不匹配引起的关键瓶.