构建改进的评估指标系统和水电站调度方案的定量方法
Yang Xu1, Bin Qiu2,3, Yichao Xu4
1School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan, 430074, China.
Scientific reports
|March 2, 2026
概括
这项研究引入了一种新的方法,用于优化水电站在水库抽水期间的调度计划. 动态指标优先级自适应指标校准方法 (HCR-DPAICM) 改善了调度方案的选择,以提高运营效率.
科学领域:
- 环境科学环境科学
- 工程 工程师 工程师 工程师
- 运营研究 运营研究
背景情况:
- 水力发电站调度需要平衡竞争对手的目标,以实现最佳的调度.
- 当前的方法在关键时期 (如水库耗尽) 难以适应不断变化的优先事项.
- 动态适应对于高效的水电运营至关重要.
研究的目的:
- 为水电计划制定一个改进的评估系统.
- 提出一种新的动态指标优先级适应性指标校准方法 (HCR-DPAICM).
- 加强在水库抽水期间选择最佳调度方案.
主要方法:
- 为调度方案构建了一个改进的评估指标系统.
- 开发了HCR-DPAICM,整合了主观客观评估的分析层次过程.
- 在抽水过程中将该方法应用于金沙河 - 三峡布.
主要成果:
- 在HCR-DPAICM方法允许动态适应转变的目标优先级.
- 综合评估有助于比较不同的调度方案.
- 该研究分析了拟议的HCR-DPAICM方法的优缺点.
结论:
- 在HCR-DPAICM提供了一个有价值的方法来选择最佳的水电站调度方案.
- 改进的动态适应在关键时期提高了运营效率.
- 这项研究为水电调度人员提供了参考资料.
相关概念视频
Routh-Hurwitz Criterion I
753
Consider an electrical power grid, where stability is essential to prevent blackouts. The Routh-Hurwitz criterion is a valuable tool for assessing system stability under varying load conditions or faults. By analyzing the closed-loop transfer function, the Routh-Hurwitz criterion helps determine whether the system remains stable.
To apply the Routh-Hurwitz criterion, a Routh table is constructed. The table's rows are labeled with powers of the complex frequency variable s, starting from the...
To apply the Routh-Hurwitz criterion, a Routh table is constructed. The table's rows are labeled with powers of the complex frequency variable s, starting from the...
753
Distribution Reliability and Automation
690
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
690
Load-frequency control
895
Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
895
Weir: Problem Solving
903
Water flow in open channels is often measured using hydraulic structures such as weirs, which allow precise calculation of discharge. In a rectangular channel, flow rates are measured using three types of weirs: rectangular sharp-crested, triangular sharp-crested, and broad-crested. The weir head is set at a fixed height above the channel bottom, simplifying calculations and enabling the relationship between depth and flow rate to be analyzed.For the rectangular sharp-crested weir, the flow...
903
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
391
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
391
Indefinite Integrals
235
The water inflow rate into a storage tank is not constant but increases over time. Initially, the pump delivers water at a rate of 5 L/min. However, the inflow rate increases by 2 L/min for each additional minute due to rising pressure or system adjustments. This scenario can be described mathematically by a linear function:It is necessary to integrate the inflow rate function to measure the total volume of water added to the tank over time. The total water volume V(t) is obtained by performing...
235