穿越空间和时间的旅程:森林规划方法对空间时间息地连接性的影响

Juliette Hunault-Fontbonne1, Rémi Duflot2, Kyle Eyvindson3

  • 1Norwegian University of Life Sciences (NMBU), Faculty of Environmental Sciences and Natural Resource Management, Høgskoleveien 12, 1433, Ås, Norway.

概括

优先考虑息地可用性而不是空间配置的森林规划增强了生物多样性和连接性. 这种方法平衡了经济价值与生态效益,用于管理景观中的物种保护.

相关概念视频

Habitat Fragmentation02:31

Habitat Fragmentation

Habitat fragmentation describes the division of a more extensive, continuous habitat into smaller, discontinuous areas. Human activities such as land conversion, as well as slower geological processes leading to changes in the physical environment, are the two leading causes of habitat fragmentation. The fragmentation process typically follows the same steps: perforation, dissection, fragmentation, shrinkage, and attrition.
21.7K
Threats to Biodiversity01:50

Threats to Biodiversity

There have been five major extinction events throughout geological history, resulting in the elimination of biodiversity, followed by a rebound of species that adapted to the new conditions. In the current geological epoch, the Holocene, there is a sixth extinction event in progress. This mass extinction has been attributed to human activities and is thus provisionally called the Anthropocene. In 2019 the human population reached 7.7 billion people and is projected to comprise 10 billion by...
27.6K
Conservation of Declining Populations02:07

Conservation of Declining Populations

Conservation of declining population focuses on ways of detecting, diagnosing, and halting a population decline. The approach uses methods to prevent populations from going extinct.
13.5K
Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
310
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
343
Conservation of Small Populations02:04

Conservation of Small Populations

Small population sizes put a species at extreme risk of extinction due to a lack of variation, and a consequent decrease in adaptability. This weakens the chances of survival under pressures such as climate change, competition from other species, or new diseases. Large populations are more likely to survive pressures such as these, as such populations are more likely to harbor individuals that have genetic variants that are adaptive under new stresses. Small populations are much less...
17.6K