相关实验视频
Updated: Mar 13, 2026

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.7K
将湿地与相对持久的流水联系起来:一个与之相连的美国地理空间分析
C R Lane1, E D'Amico2, J R Christensen3
1U.S. EPA, Office of Research and Development, Center for Environmental Measurement and Modeling, Ecosystem Processes Division, Athens, GA, USA.
概括
根据"清洁水法案" (CWA),美国大部分湿地可能受到保护. 我们的研究估计,66-79%的地湿地连接到溪流网络,影响CWA覆盖范围.
科学领域:
- 环境科学 环境科学
- 水文学的水文学
- 湿地生态学湿地生态学
背景情况:
- 清洁水法 (CWA) 保护了连续地表连接到支流的湿地.
- 由于数据缺口,估计CWA覆盖湿地的全国范围是具有挑战性的.
研究的目的:
- 估计美国可能受"清洁水法案"覆盖的湿地的国家范围.
- 确定具有与相对永久水域潜在的连续表面连接的平原湿地.
主要方法:
- 在一个高分辨率的溪流网络水文数据集周围利用了150米的缓冲区.
- 分析了与美国 (CONUS) 相连的平原湿地,以连接到溪流网络.
主要成果:
- 79% (23.1 Mha) 或66% (19.3 Mha) 的CONUS淡水棕湿地可能连接到溪流网络.
- 21% (6.1 Mha) 到34% (9.9 Mha) 的CONUS湿地可能位于缓冲区之外.
- 国家一级的结果根据溪流和湿地密度有很大差异.
结论:
- 该研究提供了对潜在的CWA管辖区湿地的关键见解,为资源管理提供了信息.
- 地理空间数据的局限性表明,连接湿地的实际范围可能小于估计.
- 调查结果有助于当地,州和部落利益相关者在湿地资源管理决策.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
347
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
347
States of Water
58.0K
Water exists in any one of the three classical states: solid (ice), liquid (water), and gas (steam or water vapor). The state of water depends on i) the intermolecular forces that draw molecules together and ii) the kinetic energy that leads to movements that pull them apart.
Water freezes when the intermolecular forces are greater than the kinetic energy. Unlike most other substances, water is less dense in its solid state than in its liquid state. This is because each water molecule can form...
Water freezes when the intermolecular forces are greater than the kinetic energy. Unlike most other substances, water is less dense in its solid state than in its liquid state. This is because each water molecule can form...
58.0K
Design Example: Alignment of a Road Line Using GIS
379
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
379
Manipulation and Analysis
314
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
314
Applications of GIS: Disaster Management and Emergency Response
615
Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
615
Thematic Layering in GIS
394
In the past, planning projects such as schools or public facilities required extensive manual effort to gather and compile data. Information such as property boundaries, soil characteristics, road networks, zoning regulations, and flood zones had to be sourced individually from courthouses, utility providers, and registry offices. Assembling these datasets into a coherent format often took several months, delaying project timelines.The introduction of Geographic Information Systems (GIS)...
394

