灾后关键基础设施系统的调度维修资源:对模型和算法的审查
Min Xu1, Min Ouyang2,3, Chongyang Du2
1School of Public Administration, Dongbei University of Finance and Economics, Dalian, China.
概括
本综述综合了灾难后关键基础设施系统 (CIS) 修复资源安排的模型. 它强调了改善城市弹性和恢复决策的挑战和模型的变化.
科学领域:
- 灾害管理 灾害管理
- 城市规划 城市规划
- 基础设施工程 基础设施工程
背景情况:
- 自然灾害威胁到城市关键基础设施系统 (CIS).
- 灾后CIS的快速恢复对于社会经济稳定和城市性至关重要.
- 由于动态环境,相互依赖和利益相关者的需求,CIS维修的资源安排是复杂的.
研究的目的:
- 系统地审查和综合现有的维修资源调度模型,用于灾后CIS恢复.
- 突出模型变化,解决方案算法以及气候变化和城市化等新出现的挑战.
- 完善当前的框架,指导开发更全面的恢复模型.
主要方法:
- 在灾难恢复中对维修资源调度模型的系统文献审查.
- 基于灾害类型和基础设施系统的模型变体和扩展的分类.
- 分析算法策略及其对不同恢复场景的适用性.
主要成果:
- 对各种维修资源调度模型及其解决方法的全面概述.
- 在灾难后的CIS恢复中发现研究缺口和新出现的挑战.
- 一个理解和比较基础设施维修不同优化策略的框架.
结论:
- 对维修计划模型的更好理解对于有效的灾后恢复至关重要.
- 应对气候变化和城市化影响对于未来的模型开发至关重要.
- 这一审查为开发更强大,更适应性的城市基础设施弹性战略提供了基础.
相关概念视频
Reclosers and Fuses
515
Automatic circuit reclosers enhance the protection of distribution circuits by interrupting and auto-reclosing an AC circuit according to a preset sequence. They effectively manage temporary faults on overhead distribution lines, often caused by tree limbs or wildlife, by briefly disrupting service to improve overall reliability. However, contact with reclosers or energized broken conductors on the ground can pose serious hazards.
A comprehensive protection scheme for radial distribution...
A comprehensive protection scheme for radial distribution...
515
Applications of GIS: Disaster Management and Emergency Response
615
Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
615
Radial System Protection
470
Radial systems employ time-delay overcurrent relays to reduce load interruptions. When a fault occurs, the nearest breaker opens first, while upstream breakers remain closed due to longer delay settings. This approach ensures minimal disruption to the rest of the system.
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
470
Distribution Reliability and Automation
555
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
555
Zones of Protection
890
In power systems, the entire setup is divided into protective zones to isolate faults and protect the rest of the network. These zones include generators, transformers, buses, transmission lines, distribution lines, and motors. Each zone can be visualized as a separate room in a house, with each room protected by its own circuit breaker.
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
890
Insulation Coordination
613
Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times...
613