概括
由于辐射效应数据不可靠,以及诸如竞争风险等复杂因素,估计发电厂对公共卫生的影响具有挑战性. 需要新的研究来准确评估发电的公共健康状况.
科学领域:
- 环境健康 环境健康
- 公共卫生政策 公共卫生政策
- 风险评估 风险评估
背景情况:
- 评估发电厂 (化石燃烧与核) 对公共卫生的影响对于新设施的定位至关重要.
- 目前用于估计正常工厂运行的健康影响 (癌症,心脏病发作) 的方法不可靠.
- 现有的辐射效应估计依赖于原子弹伤亡和动物研究的推断,这些研究存在重大局限性.
研究的目的:
- 强调缺乏可靠的方法来估计不同类型的发电厂对公众健康的影响.
- 确定当前辐射效应估计方法的关键局限性.
- 建议获得更准确的公共卫生影响数据的途径.
主要方法:
- 对估计电厂正常运行对健康影响的现有方法进行批评.
- 分析从原子弹研究和动物实验中推断辐射效应的局限性.
- 鉴定使健康影响估计复杂化的因素:竞争风险,局部污染,剂量率和物种间推断.
主要成果:
- 目前的方法无法可靠地估计癌症病例,心脏病发作和其他与电厂运行相关的疾病.
- 来自广岛/长崎和动物研究的推断是不可靠的,因为有竞争的风险,先前存在的污染,剂量率依赖性和物种间的差异.
- 为了获得可靠的估计,建议进行大型,多机构,多污染物,多局部的流行病学研究.
结论:
- 迫切需要改进的方法来评估发电对公共健康的影响.
- 直接的流行病学研究,可能包括局部调查,如在洛基平原附近的,对于现实世界的数据至关重要.
- 准确的公共卫生影响评估需要解决除了简单的剂量反应关系之外的复杂因素.
相关概念视频
Electrical Energy
Using electric appliances for a longer period of time consumes more electrical energy and results in a higher electric bill. The energy produced by the transfer of electrons from one point to another is known as electrical energy. If power is delivered at a constant rate, the electrical energy can be defined as the product of power used by the device for a period of time. The energy unit on electric bills is the kilowatt-hour, where one kilowatt-hour is equivalent to 3.6 × 106 joules. The...
Insulation Coordination
Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times for...
Power System Distribution
Power system distribution involves delivering electrical energy from power plants to consumers through a network of transmission and distribution systems. The process begins at power plants, where energy from coal, gas, nuclear, water, and wind is converted into electrical energy. These plants use three-phase generators, typically rated between 50 to 1300 MVA, with terminal voltages ranging from a few kV to 20 kV, depending on the size and age of the units.
The transmission system is designed...
The transmission system is designed...
Secondary Distribution
Secondary distribution systems provide electrical energy at the utilization voltage levels from distribution transformers to customer meters. Typical secondary voltages in the United States include 120/240 V for residential use, 208Y/120 V for residential and commercial use, and 480Y/277 V for industrial and high-rise commercial use.
In residential areas, 120/240 V single-phase, three-wire service is commonly used for lighting, outlets, and large appliances. Urban areas with high-density loads...
In residential areas, 120/240 V single-phase, three-wire service is commonly used for lighting, outlets, and large appliances. Urban areas with high-density loads...
Transformers in Distribution System
Transformers in distribution systems can be broadly categorized into distribution substation transformers and other distribution transformers. They are crucial for stepping down high transmission voltages to levels suitable for distribution and end-user applications.
Distribution substation transformers come in various ratings and typically use mineral oil for insulation and cooling. To prevent moisture and air from entering the oil, some transformers use an inert gas like nitrogen to fill the...
Distribution substation transformers come in various ratings and typically use mineral oil for insulation and cooling. To prevent moisture and air from entering the oil, some transformers use an inert gas like nitrogen to fill the...
Generator Voltage Control
Generator voltage control is crucial for maintaining the stable operation of synchronous generators and wind turbines. In older models, a DC generator driven by the rotor delivers DC power to the rotor's field winding, and the power is transferred through slip rings and brushes. In the latest models, static or brushless exciters are used. Static exciters rectify AC power from the generator terminals and then transfer the DC power directly to the rotor. Brushless exciters, on the other hand, use...