Road-edge delineation in rural areas: effects on driving behaviour

F J Steyvers1, D de Waard

  • 1Centre for Environmental and Traffic Psychology, Faculty of Psychology, Education and Sociology, University of Groningen, The Netherlands. f.j.j.m.steyvers@ppsw.rug.nl

Ergonomics
|February 16, 2000
PubMed

Related Concept Videos

Influence of Earth's Curvature and Atmospheric Refraction on Leveling01:26

Influence of Earth's Curvature and Atmospheric Refraction on Leveling

During leveling, the Earth's curvature and atmospheric refraction introduce deviations in the line of sight from a true horizontal reference. When the line of sight is leveled, it remains perpendicular to the plumb line only at a single point. Beyond this, it deviates due to the Earth’s curvature, represented by the correction C. For a sight distance D, the deviation can be derived using the relationship:This relationship shows that the deviation increases quadratically with distance. Over a...
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Design Example: Marking Boundaries of a Site Using a Compass01:12

Design Example: Marking Boundaries of a Site Using a Compass

Marking site boundaries using a compass is a precise surveying technique that ensures the accuracy of boundary delineation. The process begins by using provided site details, including the bearings and lengths of each boundary line. The initial step involves calculating latitudes and departures for all sides of the site. This computation verifies that the traverse is free of errors, ensuring a closed and accurate boundary.The process starts at a known point, such as Point A, which is often...
Sight Distance in a Vertical Curve01:29

Sight Distance in a Vertical Curve

Sight distance on vertical curves is critical in roadway design. It ensures drivers can see far enough ahead to identify and respond to hazards effectively. This directly impacts safety, driver comfort, and the overall efficiency of the transportation network.Vertical curves are classified into crest and sag curves based on their geometry. For crest curves, sight distance is determined by the line of sight between a driver's eye and a small object on the road's surface. Design parameters for...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...