S Høiset1, B H Hjertager, T Solberg
1Norsk Hydro, Research Centre, N-3901, Porsgrunn, Norway.
Comparing explosion reports from the Flixborough accident, this study found calculation-based estimates align with simulations. Visual inspection estimates were significantly lower than simulated explosion magnitudes.
You might also read
Articles linked to this work by shared authors, journal, and citation graph.
Area of Science:
Background:
Purpose of the Study:
Main Methods:
Main Results:
Conclusions: