Related Experiment Video
Updated: Aug 25, 2026

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
[Total water pollution load determining on Tianxi catchment area in Shenyang city]
1Department of Environmental Science & Engineering, Tsinghua University, Beijing 100084, China. yufeng@inet.tsinghua.edu.cn
Abstract:
This paper analysed and determined the total water pollution load of Tianxi catchment area in Shenyang city systematically; by giving the reliability measurement to the total pollution load, put forward the suggestions to improve the system information reliability. It was found that to strengthen monitoring and investigation for the pumping station is of great advantage to control the pollutants of heavy metals, moreover, by adding monitoring to the Huanglatuozi section of Xi river, not only can the pollution load be identified clearly but also organic pollutants can be controlled more accurately and timely.
Related Concept Videos
Design Example: Design of an Irrigation Channel
Microbial Wastewater Treatment
Biological Treatment of Effluent and Waste Water

