Environmental restoration at Hanford Site involved demolishing a fuel storage basin for Interim Safe Storage. Innovative methods controlled radiation exposure and contamination during the removal of hazardous materials.
Area of Science:
- Environmental Restoration
- Nuclear Decommissioning
- Radiological Control
Background:
- The Hanford Site's Environmental Restoration Contractor is responsible for decommissioning reactor structures.
- Interim Safe Storage involves removing auxiliary structures while preserving reactor core containment.
- The F Reactor fuel storage basin, deactivated in 1970, required demolition as part of this process.
Purpose of the Study:
- To describe the radiological control challenges and innovative demolition approaches for the F Reactor fuel storage basin.
- To detail methods for controlling total effective dose equivalent and contamination during demolition.
- To highlight the use of remote-operated excavators and wireless technology for radiological monitoring.
Main Methods:
- Demolition of the fuel storage basin containing debris and potential spent nuclear fuel.
- Implementation of radiological control strategies to manage dose and contamination.
- Utilization of a remote-operated excavator for handling high-dose-rate materials.
- Deployment of wireless technology for real-time monitoring of radiological conditions.
Main Results:
- Successful control of total effective dose equivalent and contamination during basin demolition.
- Effective removal of high-dose-rate materials using a remote-operated excavator.
- Real-time radiological condition monitoring enabled by wireless technology.
Conclusions:
- Innovative approaches successfully managed unique radiological challenges during the F Reactor fuel storage basin demolition.
- Remote operation and wireless monitoring were critical for safe and effective decommissioning.
- The methods employed ensured the successful placement of the F Reactor into Interim Safe Storage.