A view from industry

M L Chapek1

  • 1MVP Laboratories, Inc., Ralston, NE 68127, USA. marylou@nfinity.com

Related Concept Videos

Spindle Assembly02:50

Spindle Assembly

Spindle assembly occurs through three, often coexisting, pathways – the centrosome-mediated pathway, the chromatin-mediated pathway, and the microtubule-mediated pathway – collectively contributing to form a robust spindle apparatus.
In most cells, centrosomes are the primary microtubule nucleation centers. In the centrosome-mediated pathway, the G2-prophase transition triggers centrosome maturation and increased microtubule nucleation. Progressive nucleation results in a microtubule array...
Steel Manufacturing01:26

Steel Manufacturing

Steel manufacturing is a multi-stage process that begins by smelting iron ore into cast iron in a blast furnace. This initial stage involves layering iron ore with coke, a type of fuel, and crushed limestone within the furnace. The coke is ignited with a high volume of air, leading to the creation of carbon monoxide, which acts to reduce the iron ore to pure iron.
During this smelting process, limestone plays a crucial role by forming slag. Slag captures impurities within the molten iron, such...
Econometric Views (EViews)01:29

Econometric Views (EViews)

Econometric Views, often stylized as EViews, is a package that merges statistical analysis with econometric studies. It is designed to provide tools for time series analysis, forecasting, and econometric model simulation. The software originated from MicroTSP software and has evolved significantly since its inception in 1981. The history of EViews is marked by a continuous effort to enhance its computational speed and user interface. It was initially developed for large computing systems but...
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the instrument's...