[Work schedule and accidents among subjects digging tunnels for the new high speed railway network in Toscana]
C Capanni1, S Sartori, M Baldacci
1Dipartimento di Prevenzione, ASL 10 Firenze.
Abstract:
We analysed the temporal distribution of all the accidents occurred in the last 4 years among the workers engaged in tunnel digging for the new high speed railway network. The frequency and severity rates show significant differences according to work shifts and time of occurrence, with particular reference to hour of the day, hour of duty, day of the week, day of duty, and month of the year).
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Adjusting a Traverse
Taping Over Different Ground Profiles
Design Example: Alignment of a Road Line Using GIS
Errors in Taping