Related Experiment Video
Updated: Jun 10, 2026

Kinematic History of a Salient-recess Junction Explored through a Combined Approach of Field Data and Analog Sandbox Modeling
Published on: August 5, 2016
Foreshock sequences and short-term earthquake predictability on East Pacific Rise transform faults
Jeffrey J McGuire1, Margaret S Boettcher, Thomas H Jordan
1Department of Geology and Geophysics, Woods Hole Oceanographic Institution, Woods Hole, Massachusetts 02543-1541, USA. jmcguire@whoi.edu
Abstract:
East Pacific Rise transform faults are characterized by high slip rates (more than ten centimetres a year), predominantly aseismic slip and maximum earthquake magnitudes of about 6.5. Using recordings from a hydroacoustic array deployed by the National Oceanic and Atmospheric Administration, we show here that East Pacific Rise transform faults also have a low number of aftershocks and high foreshock rates compared to continental strike-slip faults. The high ratio of foreshocks to aftershocks implies that such transform-fault seismicity cannot be explained by seismic triggering models in which there is no fundamental distinction between foreshocks, mainshocks and aftershocks. The foreshock sequences on East Pacific Rise transform faults can be used to predict (retrospectively) earthquakes of magnitude 5.4 or greater, in narrow spatial and temporal windows and with a high probability gain. The predictability of such transform earthquakes is consistent with a model in which slow slip transients trigger earthquakes, enrich their low-frequency radiation and accommodate much of the aseismic plate motion.
Related Concept Videos
Elastic Strain Energy for Shearing Stresses
Series R—L Circuit Transients
Using Kirchhoff's Voltage Law (KVL) to analyze this circuit helps determine the total asymmetrical fault current, which consists of...
Three-Phase Short Circuit—Unloaded Synchronous Machine
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
Power System Three-Phase Short Circuits
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Fault Types
For line-to-line faults occurring between phases B and C, the...

